BidHits uses cookies to provide an individualized service and care for the privacy and protection of shared data.
By browsing this site, we understand that you agree to the terms of our Privacy Policy.
Flashing Tape Government Bids & RFPs
Government bid alerts, regional filters, and fast access to documents
See also
90% recommend BidHits (1093 real users, 09/04/2026).Methodology
USA | MA | HAMPDEN COUNTY | WESTFIELD | 01086 Small City
**** - project title: replace bldg 33 roofproject location: barnes air national guard basethis project requires all labor, tools, equipment, materials, appliances, transportation, documentation, quality control, and supervision to replace the pol operations
Roof replacement Complete removal and legal disposal of approximately **** sf of existing roofing membrane, **** sf of insulation, and flashings down to bare structural roof deck; installation of self adhered bituminous vapor retarder polyiso rigid and tapered insulation achieving minimum r 30 in a minimum of two staggered layers 1 2 inch high density glass mat gypsum cover board and a fully adhered 90 mil white epdm roofing system; work also includes **** inch pre finished aluminum flashings, edge metal, and termination bars; reuse and reflashing of one hvac curb, one exhaust fan curb, and two vent pipes; 400 sf of walkway pads; sealing all penetrations with polyurethane sealants; flood testing astm ****; infrared moisture testing astm e907; uplift testing.
AI helper
This project requires replacing the roof on Building 33 at Barnes Air National Guard Base. The scope includes complete removal of existing roofing, insulation, and flashings, followed by installation of a new EPDM roofing system with specified insulation and cover board. The contract is a single award firm fixed price, with quotes solicited only from small businesses. Award will be made on the lowest evaluated price. A 20 year NDL manufacturer warranty and a 5 year contractor workmanship warranty are required.
A 20 year NDL manufacturer warranty and a 5 year contractor workmanship warranty are required. delivery of a 20 year ndl manufacturer warranty a 5 year contractor workmanship warranty
The award will be made on the lowest evaluated price conforming to all requirements. award will be made on initial quotes without negotiations to the responsible quoter submitting the lowest evaluated price conforming to all requirements.
Quotes are solicited only from small businesses, and quoters must be registered in sam. gov and meet size standard. 100 percent small business set aside: iaw far **** 6, quotes solicited only from small businesses.
ROOF REPLACEMENT - SCOPE: The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to install a new EPDM roof system over the existing roofing systems at **** Lindberg Street at USCG Base Cape Cod H
Roof replacement New EPDM roof system installation over existing roofing systems at **** Lindberg Street, including plywood sheathing repair ( 192 sq ft), soffit vent repair ( 20 linear ft), installation of tapered insulation board, fully adhered . 060 EPDM rubber membrane, drain covers, fascia system, drip edges, chimney aluminum flashing, and . 032 thickness 5 white aluminum edge metal.
AI helper
The contractor must install a new EPDM roof system at **** Lindberg Street, USCG Base Cape Cod. Work includes replacing the existing single-ply roof, installing insulation, and various accessories. Bidders are strongly recommended to inspect the site. The performance period is 45 calendar days from the Notice to Proceed. The warranty period is one year from final acceptance. All work must comply with OSHA and local safety regulations.
The warranty shall continue for a period of one year from the date of final acceptance of the work. such warranty shall continue for a period of one year from the date of final acceptance of the work.
Bidders are strongly recommended to inspect the site where work is to be performed to satisfy them regarding all general and local conditions that may affect the cost of contract performance. bidders are strongly recommended to inspect the site where work is to be performed
The government reserves the right to direct the contractor to remove from the performance under this contract, any employee, for misconduct or security reasons. The government reserves the right to direct the contractor to remove from the performance under this contract, any employee, for misconduct or security reasons.
ROOF REPLACEMENT - SCOPE: The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to install a new EPDM roof system over the existing roofing systems at **** Lindberg Street at USCG Base Cape Cod H
Roof replacement New EPDM roof system installation over existing roofing systems at **** Lindberg Street, including plywood sheathing repair ( 192 sq ft), soffit vent repair ( 20 linear ft), installation of tapered insulation board, fully adhered . 060 EPDM rubber membrane, drain covers, fascia system, drip edges, chimney aluminum flashing, and . 032 thickness 5 white aluminum edge metal.
AI helper
The contractor must install a new EPDM roof system at **** Lindberg Street. Key requirements include protecting the property, removing and disposing of old materials legally, installing specific components like tapered insulation and aluminum flashing, and adhering to strict safety and security protocols for the base. Work must be completed within 45 calendar days of the Notice to Proceed. A one-year warranty is provided.
All work must be completed within 45 calendar days of issuance of the notice to proceed ntp by the contracting officer unless stated otherwise.
The contractor shall warrant that work performed conforms to the contract requirements and is free of any defect for a period of one year from the date of final acceptance of the work.
Bidders are strongly recommended to inspect the site where work is to be performed to satisfy them regarding all general and local conditions that may affect the cost of contract performance.
Samples, catalog cuts, shop drawings, and other information shall be submitted by the contractor as required by the list of submittals on the submittal register forms.
The government reserves the right to direct the contractor to remove from the performance under this contract, any employee, for misconduct or security reasons.
Roof replacement Removal and replacement of approximately 7, 100 square feet of existing ballasted builtup roofing with a new EPDM membrane roofing system. Scope includes removal/disposal of existing materials ( insulation, cant strips, tapered edge components, metal flashings), replacement of roof hatch/accessories, replacement of deteriorated roof decking/wood blocking, and replacement of existing roof drains and piping/insulation. Contractor must furnish and install complete system: underlayment, flat/tapered insulation, blocking, and EPDM membrane, plus new flashings, coping, fascia, and sheet metal trim/scuppers.
AI helper
The work involves removing and replacing about 7,100 sq ft of builtup roofing with a new EPDM membrane system. The scope covers disposal of old materials, replacement of roof hatch, decking, drains, and installation of the complete new system including insulation, membrane, flashings, and trim. The question submission deadline is August 19, 2026, and the bid opening is August 27, 2026. A nonmandatory prebid meeting is scheduled for August 13, 2026.
ROOF REPLACEMENT - SCOPE: The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to install a new EPDM roof system over the existing roofing systems at **** Lindberg Street at USCG Base Cape Cod H
Roof replacement New EPDM roof system installation over existing roofing systems at **** Lindberg Street, including plywood sheathing repair ( 192 sq ft), soffit vent repair ( 20 linear ft), installation of tapered insulation board, fully adhered . 060 EPDM rubber membrane, drain covers, fascia system, drip edges, chimney aluminum flashing, and . 032 thickness 5 white aluminum edge metal.
AI helper
The contractor must install a new EPDM roof system at **** Lindberg Street. Key requirements include protecting the property, removing and disposing of old materials according to regulations, installing specific components like tapered insulation and aluminum flashing, and adhering to strict security and safety protocols (OSHA, hot work permits). Work must be completed within 45 calendar days of the Notice to Proceed. A one-year warranty is provided.
All work must be completed within 45 calendar days of issuance of the notice to proceed ntp by the contracting officer unless stated otherwise.
The contractor shall warrant that work performed conforms to the contract requirements and is free of any defect for a period of one year from the date of final acceptance of the work.
Bidders are strongly recommended to inspect the site where work is to be performed to satisfy them regarding all general and local conditions that may affect the cost of contract performance.
Samples, catalog cuts, shop drawings, and other information shall be submitted by the contractor as required by the list of submittals on the submittal register forms.
The government reserves the right to direct the contractor to remove from the performance under this contract, any employee, for misconduct or security reasons.
We selected the most helpful reviews from real users. Order may change periodically.
I like the way they provide information with the greatest possible accuracy. I love that.
M. A. Neil
The search engine that finds what I'm looking for just by entering keywords
J. P. L. Construccion
The idea of ​​using a keyword and sending the information by email is very good.
U. Solutions
I consistently received notifications about bids within the specific segment I chose to monitor. The system simplifies processes that used to be complex, offering a navigation experience that is easy, fast, and modern.
G. P. da S. E. Guimaraes
All bids related to our product are captured by you and sent to us. In my opinion, it’s perfect—broad coverage and easy searches across the bid documents.
R. M. Ferreira
The information helps me submit my bids on time for bids, and I also have readily available information on upcoming bids. So far, I am very satisfied with what I have received.
M. A. Z. Armenta
Excellent information. Just what I was looking for.
L. H. Borrelli
It encompasses all portals in one place.
G. Ferrea
It gives me information on bids that interest me. It's easy to find bids.
A. Armenta
Great recommendations appear. Having the bid process link right in the email body helps a lot and saves time.
V. Kafka
You see a lot of tenders; you get emails with the alerts.
M. Camarasa
The bids appear appropriately based on my interests.
BidHits is a government bid search engine that monitors official portals and brings relevant federal, state and local opportunities into one place. You can search on the site and receive scheduled email alerts.
Enter your email and activate the trial. For 14 days you can use the main features, including alerts and access to results. When it ends, if you do not subscribe at /subscription.php, the bid list becomes limited and you will not be charged automatically.
1) Add keywords that describe what you sell. 2) Start the trial. 3) Adjust regions, delivery times and email style after signup.
Whenever possible, yes. Some official portals require login or block direct links; in those cases we point you to the official process page so you can download the documents.
Yes. You can filter by region, procurement method, dates and value ranges. You can also save preferences for future alerts and searches.
Yes. In the dashboard you can see bids on a map and use it to plan follow-up by location.
It can happen. Smart Search uses your keywords to find related opportunities, not only exact matches. Add specific terms and remove off-topic results to improve future alerts.
Yes. You can query bids via API. Documentation at /api_integration.php. Ideal for CRM, BI and automations.
In Settings you can pause alerts or adjust delivery times. If you want to delete your account, just contact us. During the free trial there is no auto-charge.
We monitor major official sources every day at the federal, state and local levels. New bid notices are added as soon as they are captured from the source portal.
Plans start at $ 43.00 per month, with options for different business needs and billing terms. Start with a free trial and evaluate the results before subscribing, with no automatic billing.
Add what you sell, get scheduled alerts, open documents or the official page, and use filters by region and method.
Transcript
Welcome to BidHits.
Finding public tenders and bids is important. But what really matters is quickly identifying the opportunities that match what your company sells.
To get started, enter a few keywords that describe your products or services. BidHits shows relevant opportunities, highlights your keywords, and organizes everything by date.
Smart search is already enabled and uses artificial intelligence to expand your results, even when the tender uses different words from the ones you searched for.
For each opportunity, you can view a summary, access documents, mark it as a favorite, add private notes, remove what is not relevant, or view it on the map.
You can also use filters, run searches, and explore the day's opportunities directly on the map.
Start using BidHits now. It's fast, practical, and you can try it for free.
AI Assistant
Ask me about the bid...
Loading summary...
Methodology
Unaided survey with 1093 active users, conducted through 09/04/2026.
Single question: "Would you recommend our services to a friend or colleague?" - 90% answered "yes".