This statement of work (SOW) outlines the requirements for upgrading the fire
alarm system in buildings 339 and 392 to meet current codes and installing new fire
alarm and mass notification systems. The contractor will be responsible for all aspects of the project, including supervision, personnel, labor, equipment, transportation, supplies, and any other necessary items. Specific requirements include compliance with various codes and standards (NFPA 70, NFPA 72, NFPA 101, IBC, UFCs), bonding requirements (FAR ****), insurance coverage, and personnel staffing plans. The SOW details specific work to be performed, including demolition, disconnection, patching, cleanup, field verification, new system installation, mass notification system requirements, fire
alarm and mass notification control units, communications, electrical safety, and cybersecurity requirements. The SOW also includes requirements for submittals, construction schedules, safety measures (OSHA, Army Corp of Engineers standards), waste management, coordination with occupants, working hours, and documentation requirements (as-built drawings, operation and maintenance manuals, and DD Form ****). Additional documents required, participation criteria, process stages, cost of the dispute, deadlines for clarification and objection, exclusivity for certain types of companies, deadline for starting services, deadline for total delivery of services, and reference documents are also included.