Town Of Highland Beach - FL
Bel Lido Bridge Rehabilitation - 1. Bridge Pier Rehabilitation: Concrete pier encasement ( 4 piers), concrete patch repair at location( s) identified on plans and epoxy crack repair at location( s) identified on plans. 2. Removal of existing decorative bridge wall cap ( EIFS material) and replacement with anchored, precast concrete decorative bridge wall cap. 3. Asphalt milling, asphalt overlay and striping of bridge deck and approaches. 4. Chemical grouting of voids at identified locations at the bridge ap
Bel Lido Bridge Rehabilitation 1. tbridge pier rehabilitation: concrete pier encasement 4 piers, concrete patch repair at locations identified on plans and epoxy crack repair at locations identified on plans. n2. tremoval of existing decorative bridge wall cap eifs material and replacement with anchored, precast concrete decorative bridge wall cap. n3. tasphalt milling, asphalt overlay and striping of bridge deck and approaches. n4. tchemical grouting of voids at identified locations at the bridge approach slabs. n5. tcleaning and coating of bridge surfaces, abutment cap, bridge railing and existing utility pipes as indicated on the plans and in the measurement payment item. n6. tremoval and reinstallation of existing guardrail if necessary to complete the rehabilitation work. n7. tmaintenance of traffic and coordination with the owner and engineer during construction. n8. tenvironmental protections: na. tcontractor is responsible for coordinating and meeting all npdes and fdep permit conditions and regulatio
Bid Close Date: