CDBG- MIT - Trenchless Installation of Utilities Across Fleming Channel - The project is located within Navy property at Trumbo Annex and involves relocating the City' s existing 30- inch influent wastewater pipeline and 8- inch water supply pipeline from their aerial crossings on Fleming Key Bridge to a new underground alignment beneath Fleming Key Cut. The crossing will consist of approximately 458 feet of 72- inch steel casing installed by microtunneling using a microtunnel boring machine ( MTBM), launch
Trenchless installation of utilities across Fleming Channel Relocation of 30- inch influent wastewater pipeline and 8- inch water supply pipeline; approximately 458 feet of 72- inch steel casing installed by microtunneling; approximately 680 feet of open- cut installation of 30- inch wastewater and 8- inch water pipelines; utility tie- ins; manholes; valve vaults; grading; fencing; temporary road construction and removal; restoration of disturbed areas