Stearns County - MN
Sp 073- 675- 043 ( csah 75 signal and ada upgrades)
Bid Close Date:
Lot 1: As built
Lot 2: Mobilization
Lot 3: Trainees
Lot 4: Pavement marking removal
Lot 5: Pavement marking removal
Lot 6: Remove curb and gutter
Lot 7: Remove concrete pavement
Lot 8: Remove concrete walk
Lot 9: Remove and replace bituminous pavement
Lot 10: Concrete pavement 8. 0
Lot 11: Adjust frame and ring casting
Lot 12: 4 concrete walk
Lot 13: 6 concrete walk
Lot 14: Drill and grout reinf bar ( epoxy coated)
Lot 15: Concrete curb ramp walk
Lot 16: Concrete sill
Lot 17: Concrete curb and gutter
Lot 18: Truncated domes
Lot 19: Traffic control supervisor
Lot 20: Traffic control
Lot 21: Alternate pedestrian route
Lot 22: Portable signal system
Lot 23: Traffic control interconnect system a
Lot 24: Traffic control interconnect system b
Lot 25: Traffic control interconnect system c
Lot 26: Traffic control interconnect system d
Lot 27: Traffic control interconnect system e
Lot 28: Traffic control interconnect system f
Lot 29: Traffic control interconnect system g
Lot 30: Traffic control interconnect system h
Lot 31: Traffic control interconnect system i
Lot 32: Traffic control interconnect system j
Lot 33: Traffic control interconnect system k
Lot 34: Traffic control signal system a
Lot 35: Traffic control signal system b
Lot 36: Traffic control signal system c
Lot 37: Traffic control signal system d
Lot 38: Traffic control signal system e
Lot 39: Traffic control signal system f
Lot 40: Traffic control signal system g
Lot 41: Traffic control signal system h
Lot 42: Traffic control signal system i
Lot 43: Traffic control signal system j
Lot 44: Traffic control signal system k
Lot 45: Erosion control supervisor
Lot 46: Storm drain inlet protection
Lot 47: Culvert end controls
Lot 48: Sediment control log type compost
Lot 49: Site restoration
Lot 50: 24 solid line multi- component ground in ( wr)
Lot 51: Crosswalk multi- component ground in ( wr)