Metropolitan District Commission - CT
WINDSOR STREET AREA SEWER SEPERATION PHASE 2: WATER MAIN RELOCATION AND REPLACE - The Work shall consist of all labor, equipment, fees, permits, and other related costs necessary to provide for the installation of approximately 2, 260 LF of 12- in ductile iron water main with restrained joints and 35 LF of 8- in ductile iron water main with restrained joints installed on Windsor Street between Sanford Street to Main Street. The transfer of 19 water services smaller than 4- inches, the transfer of 14 water s
windsor street area sewer seperation phase 2: water main relocation and replace installation of approximately 2, 260 lf of 12 in ductile iron water main with restrained joints and 35 lf of 8 in ductile iron water main with restrained joints installed on windsor street between sanford street to main street. the transfer of 19 water services smaller than 4 inches, the transfer of 14 water services greater than 4 inches, and removal and replacement of 6 fire hydrant assembly on windsor street. abandonment of approximately 2, 000 lf of existing water main on windsor street and sanford street. abandonment of approximately 1, 300 lf an existing 6 inch water main on the east side of main street, from windsor street to montville street including the transfer of 10 water services smaller than 4 inches, the transfer of 7 water services greater than 4 inches, and removal and replacement of 1 fire hydrant assembly.
Bid Close Date: