Connecticut Airport Authority - CT
Runway 2- 20 Rehabilitation - HFD - The project consists of: The project consists of a 4- inch mill and overlay of the existing pavement of Runway 2- 20 andRunway 11- 29 at the runway intersection, Runway 2 Runway Safety Area ( RSA) grading, miscellaneous airfield drainage and runway electrical improvements. Plant transplanting withinselect work areas. Variable depth milling existing bituminous pavements. Areas of the milledsurface pavement experiencing cracking will be repaired prior to placement of the ne
Bid Close Date: