Northshore Utility District - WA
Holmes Point Drive Water Main Replacement - Phase 1 Project, Northshore Utility District, King County, WA # **** - The project consists of the following work: Installation of approximately 5, 700 LF of 8" ductile iron water main and meter replacements in the Holmes Point Drive area from Champagne Point to OO Denny Park, approximately 775 LF of 21" and 24" PVC gravity sewer main replacement including side sewer reconnections within project limits in Holmes Point Drive near OO Denny Park, and approximately 5
Holmes Point Drive Water Main Replacement - Phase 1 Project Installation of approximately 5, 700 LF of 8- inch ductile iron water main and meter replacements; approximately 775 LF of 21- inch and 24- inch PVC gravity sewer main replacement including side sewer reconnections; approximately 500 LF of stormwater system replacement; overlay of approximately 17, 600 SY of asphalt roadway