This is an addendum to the bidding documents for the Rickwood Caverns State Park Pool House project. It modifies the project manual and construction plans, including changes to toilet accessories, gutters and downspouts, and metal roof panels. Clarifications are provided, and contractors are instructed to submit all questions to ***@***. *. * by Friday, May 29, 2026, 11:00 a. m. CST. A prebid conference was held on Wednesday, May 13, 2026. Bid documents are available electronically at no cost. The bid due date is Thursday, June 04, 2026, 2:00 p. m. CST, and the bid opening is Friday, June 05, 2026, 2:00 p. m. CST, at the ADCNR conference room in Montgomery, AL. Contractors must use the specified proposal forms and acknowledge receipt of addenda. The owner intends to announce the bid award to the lowest qualified bidder within 30 days of bid opening. The construction start date is Tuesday, September 8, 2026, with a completion date of 120 calendar days from the NTP. Liquidated damages are **** per day. Bidders are responsible for investigating the project site. Samples must be submitted for gutters and downspouts.
The construction completion date is 120 calendar days from the Notice to Proceed (NTP).
The owner intends to announce the bid award to the lowest qualified bidder.
The owner intends to announce the bid award to the lowest qualified bidder.
Liquidated damages are **** per day.
Bidders shall thoroughly investigate the project site to fully understand the scope of work required by the contract documents. Site visits can be arranged if needed by contacting jake ross.
Submit two samples, 1 inch long, illustrating component design, finish, color, and configuration for gutters and downspouts.
Failure to acknowledge receipt of this addendum may disqualify future bidders.