Camp Fire Inland Northwest
And Electrical Components; Installation Of New Booster Pumps/ Mechanical Piping And Fittings/ And Electrical Components; And Installation Of A New Control Panel And Scada System. Schedule B/ Distribution System: Replacement Of Existing Water Mains/ And Fire Hydrants; Installation Of New Water Mains/ And Fire Hydrants; And Installation Of New Water Meters And Backflow Preventers. Schedule C/ Wastewater Collection System: Replacement Of Existing Sewer Mains And Manholes;
Camp Sweyolakan Water System Improvements- Work associated with the proposed project is generally described as follows: Schedule A - Intake System, Booster Station, and Treatment Facility: Replacement of existing intake system including pumps, piping, and fittings; upgrades to existing treatment facility including filter replacement, mechanical piping and fitting replacement, and installation of two new final filters replacement of existing booster station including booster pumps, mechanical piping and fitt
Bid Close Date: