City Of Santa Clarita
Santa Clarita Aquatics Center Pool Pump Replacement The City of Santa Clarita ( City) is soliciting competitive bids for the purchase of seven ( 7) pool water circulation pump assemblies manufactured by PACO Pump for replacing existing pump assemblies at the Santa Clarita Aquatics Center, located at **** Centre Pointe Parkway. These several pump assemblies are specified in the 100% Plans for Construction drafted by the design consultant Aquatic Design Group.
Bid Close Date:
Lot 1: PACO # **** - Counterclockwise Rotation
Lot 2: PACO # **** - Clockwise Rotation
Lot 3: PACO # **** - Clockwise Rotation
Lot 4: PACO # **** - Clockwise Rotation
Lot 5: PACO # **** - Clockwise Rotation
Lot 6: Manway Covers Kit
Lot 7: Delivery to City of Santa Clarita, FOB