Cedar River Water & Sewer District
East Reservoir Booster Pump Station Upgrade, Cedar River Water & Sewer District, Maple Valley, WA
replacement of existing diesel pump fire pump system with electrical vertical inline booster pump pump replace existing pump no. 1 and pump no. 2. install and maintain temporary bypass pumping system with backup power. provide new mechanical piping and valves. provide new flow meter and water quality analyzer. install an outdoor rated 250 kw generator with subbase diesel fuel tank. upsize utility polemount transformers and secondary conductors and conduit. replace existing 200amp rated electrical service and distribution equipment with 400amp rated equipment. install a vfd for the new pump no. 3. replace the existing stepdown transformer inside the building. replace the existing pump no. 1 and pump no. 2 vfds. replace the existing building overhead lights, outdoor lights, and site light.
Bid Close Date: