08/04/2025 - USA | NM | MCKINLEY COUNTY | MENTMORE | 87319
The Navajo Division of Transportation ( Navajo DOT) is soliciting proposals to construct N55( 1 2) 4 Road Project from MP **** to MP ****, Socorro County, NM . The proposed work consists of roadway excavation; milling, crack cleaning/sealing of existing pavement surface; placement of aggregate base course, geogrid and asphalt pavement; striping, and other miscellaneous work as called for in the design plans and specifications for this ****- mile roadway project located on N55 from MP 17. 2
Construction of **** road project from MP **** to MP ****, Socorro County, NM. extra miscellaneous work authorized under **** of exhibit **** all required lump sum 300, ****, unsuitable material excavation 2, 000 cy, base course 925 ton, asphalt material for tack coat 50 ton, prime coat material 6 ton, hot poured crack sealing 8 mi, cold milling asphalt 22, 750 sy, hma sp iv complete 2 overlay 14, 600 ton, hma sp iv complete 3 bottom lift 440 ton, fog seal 95 ton, removal of surfacing ls, traffic control management 1 ls, mobilization 1 ls, traffic control devices for construction 1 ls, retroflectorized pavement markings 4 98, 200 lf, construction staking by the contractor 1 ls
AI helper
Proposals must be submitted by July 17, 2025, at 4:00 PM MDST, to the Navajo Division of Transportation. The project involves constructing **** miles of roadway on N55 from MP **** to MP **** in Socorro County, NM. A mandatory virtual pre-proposal meeting is scheduled for June 24, 2025, at 10:00 AM MDST. Questions regarding the RFP must be submitted by June 27, 2025, at 3:00 PM MDST. The Navajo Nation Business Opportunity Act and Navajo Preference Act apply. The RFP package is available for download from the Navajo DOT website beginning June 19, 2025, at 10:00 AM MDST. Proposals must include a bid schedule in a separate sealed envelope. The bid includes various items like excavation, milling, base course, asphalt, and traffic control. The estimated total value is $8,265,000. 00. The successful contractor will be selected by the week of July 28, 2025.
Proposals must be physically submitted to the following address by July 17, 2025, no later than 4:00 PM MDST.
The review panel will select the respondent most responsive to the needs of the Navajo nation and the Navajo DOT, based on the evaluation criteria established in this RFP.
Prospective bidders are encouraged to familiarize themselves with the Navajo nation business opportunity act and navajo preference act.
Contractors are encouraged to conduct a field review of the project site on their own.
The estimated total value is $8,265,****.