City Of Pilot Point
Pilot Point WWTP Improvements - Work Package # 04 - Headworks Structures This Work Package includes furnishing and constructing all headworks- related structures, piping, paving, and associated civil work in accordance with the Contract Documents. Key Scope Elements: Furnish all labor, equipment, materials, transportation, supervision, incidentals, and insurance required to construct the following major facilities: Flow Equalization Basin ( FEB) FEB Return Lift StationInfluent Splitter BoxHeadworks Screenin
pilot point wwtp improvements work package 04 headworks structures furnishing and constructing all headworks related structures, piping, paving, and associated civil work in accordance with the contract documents. key scope elements: furnish all labor, equipment, materials, transportation, supervision, incidentals, and insurance required to construct the following major facilities: flow equalization basin feb feb return lift stationinfluent splitter boxheadworks screening facilitiesgrit chambersinfluent lift stationflow meter structuredemolition: demolish and dispose of six 6 existing sludge drying beds per construction drawings volume 6. paving: furnish and install concrete paving around the headworks structures and gravel surfacing in adjacent areas, in accordance with the contract documents. piping: excavate, install, connect, test, and backfill all piping and manholes, including connections to existing systems. piping systems include: non potable water npw storm water sw primary effluent pe raw sewage rs,
Bid Close Date: