This is a statement of work for the cosmetic repair of a pedestrian bridge foundation at Mammoth Cave National Park. The scope of work includes surface crack and spall repair, beneath-bridge substructure repairs, and sandstone veneer installation. The contractor must maintain continuous pedestrian access across the bridge throughout the project duration and implement full overhead protection measures to prevent debris from falling. Work hours are Monday through Friday, 8:00 am to 5:00 pm. All bidders are required to visit the site. A site-specific accident prevention plan must be submitted, along with shop drawings and product data for all materials. The period of performance is 180 calendar days from the date of notice to proceed. Project closeout includes final site cleaning, submission of warranty documents, and photo documentation.
The period of performance is 180 calendar days from the date of notice to proceed (NTP), inclusive of weather delays and administrative time. The bid notice states Period of performance: 180 calendar days from the date of notice to proceed ntp, inclusive of weather delays and administrative time.
The bid notice mentions submission of all warranty documents as part of project closeout, but does not specify the duration or terms. The bid notice states contractor shall perform: final site cleaning submission of all warranty documents photo documentation pre, progress, and final asbuilt drawings if deviations occurcor will conduct a final inspection and issue acceptance within 10 business days of request. punch list must be completed within 30 calendar days.
The bid notice requires the contractor to furnish all labor, materials, tools, equipment, transportation, and supervision necessary to perform the tasks in accordance with applicable standards. It also requires submission of a site-specific accident prevention plan, shop drawings, and product data. The bid notice states he contractor shall furnish all labor, materials, tools, equipment, transportation, and supervision necessary to perform the following tasks in accordance with applicable aci, astm, osha, smacna, and nps historical preservation standards.
All bidders are required to visit the site. The bid notice states all bidders are required to visit the site.