BidHits™

Hour Meter Government Bids & RFPs

Government bid alerts, regional filters, and fast access to documents

90% recommend BidHits (1099 real users, 09/29/2026). Methodology

USA | KY | FRANKLIN COUNTY | FRANKFORT Small City

Commonwealth Of Kentucky - Office Of The Controller - KY

Water and Wastewater Operations, Maintenance, Monitoring

Bid Close Date:

Lot 6: Hourly rate. The Contractor shall provide qualified instrumentation and controls personnel to maintain and troubleshoot the control systems supporting Water Operations. Responsibilities may include: tTroubleshooting instrumentation and control system failures. tCalibrating sensors, meters, transmitters, and related instruments. tTesting and repairing control devices. tTroubleshooting Programmable Logic Controllers ( PLCs). tTroubleshooting Human- Machine Interfaces ( HMIs). tSupporting Supervisory Control and Data Acquisition ( SCADA) systems. tTroubleshooting communication between field devices and control systems. tRepairing or replacing instrumentation and control components. tModifying control logic when specifically authorized. tSupporting automated water and wastewater treatment processes. tDocumenting calibration, testing, repairs, and system modifications. tAssisting Water Operations personnel with system optimization and troubleshooting. tSub- contracting is authorized Any modification to PLC programming, SCADA systems, or control logic shall require authorization from Bluegrass Station prior to implementation.

Lot 1: Monthly fixed price for full system operations and compliance support. Facilities include but are not limited to; tOne geographic location, Bluegrass Station in Lexington, KY, Fayette County tOne 100, 000- gallon max flow WWTP with a historical average of 20, 000 GPD. tEight wastewater lift stations tOne permitted WWTP outfall tTwo permitted stormwater outfalls t16 miles of sewer collection line t8 miles of force main sewer line t21 miles of stormwater collection line tSee scope of work for more details In accordance with section 13 METHOD OF AWARD, vendor should enter the number of years of experience performing the requested services as a comment to the solicitation response.

Lot 2: There shall not be a percentage charge for laboratory services provided by the contractor due to KRS **** ( Cost Plus Contract Prohibited) and Federal Acquisition Regulations. Laboratory services shall be provided by the contract vendors at cost to the facility ( upon receipt of invoices from the laboratory services. ) The Contractor shall provide laboratory testing services necessary to monitor, evaluate, and document the performance and compliance of Bluegrass Station Water Operations. Responsibilities will include: tMonthly MOR testing tMonthly DMR testing tAnnual water quality report provided by KAW tAS NEEDED: Bacteriological water testing Responsibilities may include: tCollecting water, wastewater, sludge, and other required samples. tPerforming required chemical, biological, physical, and regulatory testing. tTesting for parameters required by applicable permits, regulatory agencies, and Water Operations requirements. tProviding properly certified laboratory analysis and test results. tMaintaining chain- of- custody documentation where required. tCoordinating sample delivery with an appropriately certified laboratory. tProviding laboratory reports to Bluegrass Station Water Operations. tPromptly notifying Bluegrass Station of test results that indicate a potential regulatory violation, operational problem, or condition requiring immediate attention. tProviding supporting laboratory invoices with reimbursement requests. tSub- contracting is authorized Laboratory services shall be performed by laboratories holding all certifications required for the applicable testing. Please enter . 01 for this line and 1 day for delivery for this line.

Lot 3: Per load pricing. The Contractor shall provide transportation and lawful disposal of residual materials generated through Bluegrass Station Water Operations. Responsibilities may include: tRemoval of sludge, residuals, screenings, grit, wastewater treatment residuals, and other authorized materials. tLoading residuals using appropriate equipment. tTransportation using properly permitted and maintained vehicles. tDisposal or beneficial reuse at an approved facility. tProviding manifests, weight tickets, disposal receipts, or other documentation required by Bluegrass Station. tMaintaining compliance with applicable environmental and transportation regulations. tProviding emergency residual removal when authorized. tPreventing spills, releases, and contamination during loading, transportation, and disposal. tSub- contracting is authorized Each load shall be documented and invoiced in accordance with the Delivery Order.

Lot 4: Hourly rate. The Contractor shall provide skilled labor necessary to diagnose, repair, restore, and maintain Water Operations equipment and infrastructure. Responsibilities may include: tTroubleshooting operational problems. tRepairing water and wastewater treatment equipment. tRepairing pumps, valves, piping, tanks, controls, and related equipment. tCorrecting mechanical and operational deficiencies. tRepairing or replacing equipment components when authorized. tPerforming preventive or corrective maintenance as directed. tResponding to equipment failures. tAssisting Water Operations personnel with troubleshooting and system restoration. tProviding labor is necessary to return equipment to safe and reliable operation. tDocumenting work performed and identifying recommended follow- up repairs. tSub- contracting is authorized Labor shall be billed at the applicable contract hourly rate.

Lot 5: Hourly rate. The Contractor shall provide qualified electrical personnel to inspect, troubleshoot, maintain, repair, modify, and install electrical systems supporting Water Operations. Responsibilities may include: tTroubleshooting electrical equipment and circuits. tRepairing electrical distribution equipment. tElectrical repairs associated with pumps, motors, blowers, controls, and treatment equipment. tRepairing or replacing wiring, conduit, disconnects, breakers, panels, and related components. tInstalling electrical equipment and components. tTesting electrical systems. tSupporting generator and emergency power systems. tPerforming electrical work associated with treatment plant improvements. tMaintaining electrical systems in accordance with applicable codes and safety requirements. tProviding emergency electrical response when authorized. tSub- contracting is authorized All electrical work shall be performed by appropriately qualified personnel and in accordance with applicable electrical codes, OSHA requirements, and Commonwealth requirements.

Lot 6: Hourly rate. The Contractor shall provide qualified instrumentation and controls personnel to maintain and troubleshoot the control systems supporting Water Operations. Responsibilities may include: tTroubleshooting instrumentation and control system failures. tCalibrating sensors, meters, transmitters, and related instruments. tTesting and repairing control devices. tTroubleshooting Programmable Logic Controllers ( PLCs). tTroubleshooting Human- Machine Interfaces ( HMIs). tSupporting Supervisory Control and Data Acquisition ( SCADA) systems. tTroubleshooting communication between field devices and control systems. tRepairing or replacing instrumentation and control components. tModifying control logic when specifically authorized. tSupporting automated water and wastewater treatment processes. tDocumenting calibration, testing, repairs, and system modifications. tAssisting Water Operations personnel with system optimization and troubleshooting. tSub- contracting is authorized Any modification to PLC programming, SCADA systems, or control logic shall require authorization from Bluegrass Station prior to implementation.

Lot 7: Hourly rate. The Contractor shall provide emergency labor to respond to urgent or critical Water Operations failures that could result in loss of service, environmental impact, equipment damage, regulatory non- compliance, or unsafe conditions. Emergency services may include: tWater treatment system failures. tWastewater treatment system failures. tPump failures. tElectrical failures. tControl system failures. tMajor leaks or system failures. tLoss of electrical power. tGenerator or emergency power failures. tCritical instrumentation failures. tFlooding or other facility emergencies. tStorm- related damage. tEnvironmental or regulatory emergencies. tOther conditions designated as an emergency by Bluegrass Station. The Contractor shall: tProvide an emergency contact available 24 hours per day, 365 days per year. tRespond within the timeframe established by the applicable Delivery Order or emergency call. tProvide qualified personnel and appropriate equipment. tTake immediate action to stabilize the system and protect personnel, equipment, and the environment. tCoordinate emergency activities with Bluegrass Station Water Operations personnel. tProvide a written summary of emergency work performed upon request. Emergency labor shall be billed at the established emergency hourly rate.

Lot 8: Per meter. The Contractor shall test water meters ranging from 5/8- inch through 1- inch in accordance with applicable standards and Bluegrass Station requirements. Responsibilities may include: tRemoving and/or isolating the meter as necessary. tInspecting the meter for visible damage or defects. tTesting meter accuracy. tIdentifying meters operating outside acceptable tolerances. tDocumenting meter readings and test results. tIdentifying meters requiring repair or replacement. tReinstalling tested meters when included in the Delivery Order. tProviding a written test report. tSub- contracting is authorized Each meter shall be individually identified and the test results documented.

Lot 9: Per meter. The Contractor shall test 2- inch water meters serving Bluegrass Station facilities. Responsibilities may include: tInspecting the meter and associated connections. tTesting meter accuracy. tIdentifying excessive wear, damage, or malfunction. tDocumenting beginning and ending readings. tRecording test results and accuracy. tIdentifying meters requiring repair, calibration, or replacement. tReinstalling the meter when authorized. tProviding documentation of testing performed. tSub- contracting is authorized Each meter shall be individually identified and documented.

Lot 10: Per meter. The Contractor shall test 3- inch water meters serving Bluegrass Station facilities. Responsibilities may include: tInspecting the meter and associated components. tTesting meter accuracy. tIdentifying damage, wear, or malfunction. tDocumenting meter readings. tRecording test results and accuracy. tIdentifying meters requiring repair, calibration, or replacement. tReinstalling the meter when authorized. tProviding a written test report. tSub- contracting is authorized Each meter shall be individually identified and documented.

Lot 11: There shall not be a percentage charge for parts provided by the repair technician for as needed repairs due to KRS **** ( Cost Plus Contract Prohibited) and Federal Acquisition Regulations. Repair parts shall be provided by the contract vendors at cost to the facility ( upon receipt of invoices from the manufacturer. ) The Contractor shall provide materials, replacement parts, components, and consumables necessary to complete authorized work under this Master Agreement. Materials may include: tPumps and pump components. tMotors. tValves and valve components. tPiping and fittings. tElectrical components. tControl components. tInstrumentation. tSensors and transmitters. tPLC and SCADA components. tWater meter components. tTreatment equipment components. tFilters and treatment consumables. tGaskets, seals, fasteners, and related hardware. tOther materials are specifically authorized by Bluegrass Station. Materials shall be: tNew and suitable for the intended application unless otherwise approved. tCompatible with existing Water Operations equipment. tPurchased from reputable suppliers. tBilled at the Contractor' s actual documented acquisition cost. tSupported by original supplier invoices or receipts. Please enter . 01 for this line and 1 day for delivery for this line.

USA | KY | FRANKLIN COUNTY | FRANKFORT Small City

Commonwealth Of Kentucky - Office Of The Controller - KY

Water and Wastewater Operations, Maintenance, Monitoring

Bid Close Date:

Lot 6: Hourly rate. The Contractor shall provide qualified instrumentation and controls personnel to maintain and troubleshoot the control systems supporting Water Operations. Responsibilities may include: tTroubleshooting instrumentation and control system failures. tCalibrating sensors, meters, transmitters, and related instruments. tTesting and repairing control devices. tTroubleshooting Programmable Logic Controllers ( PLCs). tTroubleshooting Human- Machine Interfaces ( HMIs). tSupporting Supervisory Control and Data Acquisition ( SCADA) systems. tTroubleshooting communication between field devices and control systems. tRepairing or replacing instrumentation and control components. tModifying control logic when specifically authorized. tSupporting automated water and wastewater treatment processes. tDocumenting calibration, testing, repairs, and system modifications. tAssisting Water Operations personnel with system optimization and troubleshooting. tSub- contracting is authorized Any modification to PLC programming, SCADA systems, or control logic shall require authorization from Bluegrass Station prior to implementation.

Lot 1: Monthly fixed price for full system operations and compliance support. Facilities include but are not limited to; tOne geographic location, Bluegrass Station in Lexington, KY, Fayette County tOne 100, 000- gallon max flow WWTP with a historical average of 20, 000 GPD. tEight wastewater lift stations tOne permitted WWTP outfall tTwo permitted stormwater outfalls t16 miles of sewer collection line t8 miles of force main sewer line t21 miles of stormwater collection line tSee scope of work for more details In accordance with section 13 METHOD OF AWARD, vendor should enter the number of years of experience performing the requested services as a comment to the solicitation response.

Lot 2: There shall not be a percentage charge for laboratory services provided by the contractor due to KRS **** ( Cost Plus Contract Prohibited) and Federal Acquisition Regulations. Laboratory services shall be provided by the contract vendors at cost to the facility ( upon receipt of invoices from the laboratory services. ) The Contractor shall provide laboratory testing services necessary to monitor, evaluate, and document the performance and compliance of Bluegrass Station Water Operations. Responsibilities will include: tMonthly MOR testing tMonthly DMR testing tAnnual water quality report provided by KAW tAS NEEDED: Bacteriological water testing Responsibilities may include: tCollecting water, wastewater, sludge, and other required samples. tPerforming required chemical, biological, physical, and regulatory testing. tTesting for parameters required by applicable permits, regulatory agencies, and Water Operations requirements. tProviding properly certified laboratory analysis and test results. tMaintaining chain- of- custody documentation where required. tCoordinating sample delivery with an appropriately certified laboratory. tProviding laboratory reports to Bluegrass Station Water Operations. tPromptly notifying Bluegrass Station of test results that indicate a potential regulatory violation, operational problem, or condition requiring immediate attention. tProviding supporting laboratory invoices with reimbursement requests. tSub- contracting is authorized Laboratory services shall be performed by laboratories holding all certifications required for the applicable testing. Please enter . 01 for this line and 1 day for delivery for this line.

Lot 3: Per load pricing. The Contractor shall provide transportation and lawful disposal of residual materials generated through Bluegrass Station Water Operations. Responsibilities may include: tRemoval of sludge, residuals, screenings, grit, wastewater treatment residuals, and other authorized materials. tLoading residuals using appropriate equipment. tTransportation using properly permitted and maintained vehicles. tDisposal or beneficial reuse at an approved facility. tProviding manifests, weight tickets, disposal receipts, or other documentation required by Bluegrass Station. tMaintaining compliance with applicable environmental and transportation regulations. tProviding emergency residual removal when authorized. tPreventing spills, releases, and contamination during loading, transportation, and disposal. tSub- contracting is authorized Each load shall be documented and invoiced in accordance with the Delivery Order.

Lot 4: Hourly rate. The Contractor shall provide skilled labor necessary to diagnose, repair, restore, and maintain Water Operations equipment and infrastructure. Responsibilities may include: tTroubleshooting operational problems. tRepairing water and wastewater treatment equipment. tRepairing pumps, valves, piping, tanks, controls, and related equipment. tCorrecting mechanical and operational deficiencies. tRepairing or replacing equipment components when authorized. tPerforming preventive or corrective maintenance as directed. tResponding to equipment failures. tAssisting Water Operations personnel with troubleshooting and system restoration. tProviding labor is necessary to return equipment to safe and reliable operation. tDocumenting work performed and identifying recommended follow- up repairs. tSub- contracting is authorized Labor shall be billed at the applicable contract hourly rate.

Lot 5: Hourly rate. The Contractor shall provide qualified electrical personnel to inspect, troubleshoot, maintain, repair, modify, and install electrical systems supporting Water Operations. Responsibilities may include: tTroubleshooting electrical equipment and circuits. tRepairing electrical distribution equipment. tElectrical repairs associated with pumps, motors, blowers, controls, and treatment equipment. tRepairing or replacing wiring, conduit, disconnects, breakers, panels, and related components. tInstalling electrical equipment and components. tTesting electrical systems. tSupporting generator and emergency power systems. tPerforming electrical work associated with treatment plant improvements. tMaintaining electrical systems in accordance with applicable codes and safety requirements. tProviding emergency electrical response when authorized. tSub- contracting is authorized All electrical work shall be performed by appropriately qualified personnel and in accordance with applicable electrical codes, OSHA requirements, and Commonwealth requirements.

Lot 6: Hourly rate. The Contractor shall provide qualified instrumentation and controls personnel to maintain and troubleshoot the control systems supporting Water Operations. Responsibilities may include: tTroubleshooting instrumentation and control system failures. tCalibrating sensors, meters, transmitters, and related instruments. tTesting and repairing control devices. tTroubleshooting Programmable Logic Controllers ( PLCs). tTroubleshooting Human- Machine Interfaces ( HMIs). tSupporting Supervisory Control and Data Acquisition ( SCADA) systems. tTroubleshooting communication between field devices and control systems. tRepairing or replacing instrumentation and control components. tModifying control logic when specifically authorized. tSupporting automated water and wastewater treatment processes. tDocumenting calibration, testing, repairs, and system modifications. tAssisting Water Operations personnel with system optimization and troubleshooting. tSub- contracting is authorized Any modification to PLC programming, SCADA systems, or control logic shall require authorization from Bluegrass Station prior to implementation.

Lot 7: Hourly rate. The Contractor shall provide emergency labor to respond to urgent or critical Water Operations failures that could result in loss of service, environmental impact, equipment damage, regulatory non- compliance, or unsafe conditions. Emergency services may include: tWater treatment system failures. tWastewater treatment system failures. tPump failures. tElectrical failures. tControl system failures. tMajor leaks or system failures. tLoss of electrical power. tGenerator or emergency power failures. tCritical instrumentation failures. tFlooding or other facility emergencies. tStorm- related damage. tEnvironmental or regulatory emergencies. tOther conditions designated as an emergency by Bluegrass Station. The Contractor shall: tProvide an emergency contact available 24 hours per day, 365 days per year. tRespond within the timeframe established by the applicable Delivery Order or emergency call. tProvide qualified personnel and appropriate equipment. tTake immediate action to stabilize the system and protect personnel, equipment, and the environment. tCoordinate emergency activities with Bluegrass Station Water Operations personnel. tProvide a written summary of emergency work performed upon request. Emergency labor shall be billed at the established emergency hourly rate.

Lot 8: Per meter. The Contractor shall test water meters ranging from 5/8- inch through 1- inch in accordance with applicable standards and Bluegrass Station requirements. Responsibilities may include: tRemoving and/or isolating the meter as necessary. tInspecting the meter for visible damage or defects. tTesting meter accuracy. tIdentifying meters operating outside acceptable tolerances. tDocumenting meter readings and test results. tIdentifying meters requiring repair or replacement. tReinstalling tested meters when included in the Delivery Order. tProviding a written test report. tSub- contracting is authorized Each meter shall be individually identified and the test results documented.

Lot 9: Per meter. The Contractor shall test 2- inch water meters serving Bluegrass Station facilities. Responsibilities may include: tInspecting the meter and associated connections. tTesting meter accuracy. tIdentifying excessive wear, damage, or malfunction. tDocumenting beginning and ending readings. tRecording test results and accuracy. tIdentifying meters requiring repair, calibration, or replacement. tReinstalling the meter when authorized. tProviding documentation of testing performed. tSub- contracting is authorized Each meter shall be individually identified and documented.

Lot 10: Per meter. The Contractor shall test 3- inch water meters serving Bluegrass Station facilities. Responsibilities may include: tInspecting the meter and associated components. tTesting meter accuracy. tIdentifying damage, wear, or malfunction. tDocumenting meter readings. tRecording test results and accuracy. tIdentifying meters requiring repair, calibration, or replacement. tReinstalling the meter when authorized. tProviding a written test report. tSub- contracting is authorized Each meter shall be individually identified and documented.

Lot 11: There shall not be a percentage charge for parts provided by the repair technician for as needed repairs due to KRS **** ( Cost Plus Contract Prohibited) and Federal Acquisition Regulations. Repair parts shall be provided by the contract vendors at cost to the facility ( upon receipt of invoices from the manufacturer. ) The Contractor shall provide materials, replacement parts, components, and consumables necessary to complete authorized work under this Master Agreement. Materials may include: tPumps and pump components. tMotors. tValves and valve components. tPiping and fittings. tElectrical components. tControl components. tInstrumentation. tSensors and transmitters. tPLC and SCADA components. tWater meter components. tTreatment equipment components. tFilters and treatment consumables. tGaskets, seals, fasteners, and related hardware. tOther materials are specifically authorized by Bluegrass Station. Materials shall be: tNew and suitable for the intended application unless otherwise approved. tCompatible with existing Water Operations equipment. tPurchased from reputable suppliers. tBilled at the Contractor' s actual documented acquisition cost. tSupported by original supplier invoices or receipts. Please enter . 01 for this line and 1 day for delivery for this line.

08/28/2026 - USA | IL | MADISON COUNTY | PITTSFIELD Small City

Illinois Bidbuy - Dnr - Natural Resources - IL

Jubilee College State Park Zero Turn Mower

zero turn mower Jubilee College State Park zero turn mower, commercial mower with no less than 37 hp diesel engine, liquid cooled, 72- inch cutting deck side discharge, hydraulic lift deck, digital multifunction display, dual hydro drive pumps, disk brakes, minimum **** rear tires, hour meter, comfort ride seat, roll over protection.

Bid Close Date:

08/21/2026 - USA | GA | FULTON COUNTY | ATLANTA Midsize City

Fulton County Government

Water Meter Installation

Small Water Meter Installation To provide Small Water Meter Installation services for the Department of Public Works

small water meter installation services

Bid Close Date:

Lot 1: Tap and Meter Installation Brand Preference Not Applicable - Service Item

Lot 2: 1 Tap and Meter Installation Brand Preference Not Applicable - Service Item

Lot 3: 1 Tap and Meter Installation Brand Preference Not Applicable - Service Item

Lot 4: 2 Tap and Meter Installation Brand Preference Not Applicable - Service Item

Lot 5: Replacement of meter Brand Preference Not Applicable - Service Item

Lot 6: Replacement of 1 meter Brand Preference Not Applicable - Service Item

Lot 7: Replacement of 1 meter Brand Preference Not Applicable - Service Item

Lot 8: Replacement of 2 meter Brand Preference Not Applicable - Service Item

Lot 9: Replacement of short side service Brand Preference Not Applicable - Service Item

Lot 10: Replacement of long side service Brand Preference Not Applicable - Service Item

Lot 11: Replacement of 1 short side service Brand Preference Not Applicable - Service Item

Lot 12: Replacement of 1 long side service Brand Preference Not Applicable - Service Item

Lot 13: Replacement of 1 short side service Brand Preference Not Applicable - Service Item

Lot 14: Replacement of 1 long side service Brand Preference Not Applicable - Service Item

Lot 15: Replacement of 2 short side service Brand Preference Not Applicable - Service Item

Lot 16: Replacement of 2 long side service Brand Preference Not Applicable - Service Item

Lot 17: Replacement of meter box for or 1 meter Brand Preference Not Applicable - Service Item

Lot 18: Replacement of meter box 1 or 2 meter Brand Preference Not Applicable - Service Item

Lot 19: Additional copper service in excess of 15 for short side Brand Preference Not Applicable - Service Item

Lot 20: Additional copper service in excess of 45 for long side Brand Preference Not Applicable - Service Item

Lot 21: Additional 1 copper service in excess of 15 for short side Brand Preference Not Applicable - Service Item

Lot 22: Additional 1 copper service in excess of 45 for long side Brand Preference Not Applicable - Service Item

Lot 23: Additional 1 copper service in excess of 15 for short side Brand Preference Not Applicable - Service Item

Lot 24: Additional 1 copper service in excess of 45 for long side Brand Preference Not Applicable - Service Item

Lot 25: Additional 2 copper service in excess of 15 for short side Brand Preference Not Applicable - Service Item

Lot 26: Additional 2 copper service in excess of 45 for long side Brand Preference Not Applicable - Service Item

Lot 27: Direct Connect Meter replacement ( & 1 ) Brand Preference Not Applicable - Service Item

Lot 28: Remove & Replace Concrete Curb Brand Preference Not Applicable - Service Item

Lot 29: Remove & Replace Granite Curb Brand Preference Not Applicable - Service Item

Lot 30: Remove & Replace Concrete Driveway Brand Preference Not Applicable - Service Item

Lot 31: Remove & Replace Asphalt Driveway Brand Preference Not Applicable - Service Item

Lot 32: Remove & Replace Gravel Driveway Brand Preference Not Applicable - Service Item

Lot 33: Remove & Replace Decorative Paver Brand Preference Not Applicable - Service Item

Lot 34: Remove & Replace Brick Driveway Brand Preference Not Applicable - Service Item

Lot 35: Remove & Replace Concreate Sidewalk Brand Preference Not Applicable - Service Item

Lot 36: Remove & Replace Concrete Pavement Brand Preference Not Applicable - Service Item

Lot 37: Remove & Replace Asphalt Pavement Brand Preference Not Applicable - Service Item

Lot 38: Asphalt Milling & Overlay Brand Preference Not Applicable - Service Item

Lot 39: FC Standard utility Cut Replacement Brand Preference Not Applicable - Service Item

Lot 40: 1 in Type E Asphalt Topping Brand Preference Not Applicable - Service Item

Lot 41: After Normal Hours Brand Preference Not Applicable - Service Item

Lot 42: Weekend and Holidays Brand Preference Not Applicable - Service Item

Lot 43: Other Work Brand Preference Not Applicable - Service Item

Lot 44: Temporary Grassing Brand Preference Not Applicable - Service Item

Lot 45: Type A Silt Fence Brand Preference Not Applicable - Service Item

Lot 46: Type B Silt Fence Brand Preference Not Applicable - Service Item

Lot 47: Type C Silt Fence Brand Preference Not Applicable - Service Item

Lot 48: Staked Hay Bales Brand Preference Not Applicable - Service Item

Lot 49: Dirt Bag ( silt control pumping station) Brand Preference Not Applicable - Service Item

Lot 50: Replacement of SOD Brand Preference Not Applicable - Service Item

Lot 51: Tree Protection Fence ( active) Brand Preference Not Applicable - Service Item

Lot 52: Tree Protection Fence ( passive) Brand Preference Not Applicable - Service Item

Lot 53: Tree Removal, easy access Brand Preference Not Applicable - Service Item

Lot 54: Tree Removal, difficult access Brand Preference Not Applicable - Service Item

Lot 55: Excavation and removal of rock Brand Preference Not Applicable - Service Item

Lot 56: Equipment and Operator Brand Preference Not Applicable - Service Item

Lot 57: Trip Fee Brand Preference Not Applicable - Service Item

Lot 58: Suitable Earth Materials ( borrow) Brand Preference Not Applicable - Service Item

Lot 59: Crusher Run Brand Preference Not Applicable - Service Item

Lot 60: Crushed Stone, No. 57 Brand Preference Not Applicable - Service Item

Lot 61: M- 10 Sand Brand Preference Not Applicable - Service Item

Lot 62: 4- ft High Chain Link Brand Preference Not Applicable - Service Item

Lot 63: 6- ft High Chain Link Brand Preference Not Applicable - Service Item

Lot 64: 4- ft High Wood Brand Preference Not Applicable - Service Item

Lot 65: 6- ft High Wood Brand Preference Not Applicable - Service Item

Lot 66: Traffic Control - Std. DOT Barrier Brand Preference Not Applicable - Service Item

Lot 67: Traffic Control - MUTCD - Std. Safety Barrel Brand Preference Not Applicable - Service Item

Lot 68: Traffic Control - Police Cruiser Brand Preference Not Applicable - Service Item

Lot 69: Traffic Control - Certified Flagman Brand Preference Not Applicable - Service Item

Lot 70: Traffic Control - Light Plant Brand Preference Not Applicable - Service Item

Lot 71: Traffic Control - Electronic Message Board Brand Preference Not Applicable - Service Item

08/19/2026 - USA | GA | FULTON COUNTY | ATLANTA Midsize City

Fulton County Government

Large Water Meter Installation Large Water Meter Installation

Bid Close Date:

Lot 94: LABOR AND EQUIPMENT IN CONJUNCTION WITH NEW METER INSTALLATION OR METER REPLACEMENT ( PREMIUM SERVICES) After Normal Hours Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 1: NEW INSTALLATION OF LARGE METERS INCLUDING VAULTS, VALVES & BYPASS PIPING up to 20 ft. 3 meter Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 2: NEW INSTALLATION OF LARGE METERS INCLUDING VAULTS, VALVES & BYPASS PIPING up to 20 ft. 4 meter Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 3: NEW INSTALLATION OF LARGE METERS INCLUDING VAULTS, VALVES & BYPASS PIPING up to 20 ft. 6 meter Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 4: NEW INSTALLATION OF LARGE METERS INCLUDING VAULTS, VALVES & BYPASS PIPING up to 20 ft. 8 meter Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 5: NEW INSTALLATION OF LARGE METERS INCLUDING VAULTS, VALVES & BYPASS PIPING up to 20 ft. 10 meter Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 6: NEW INSTALLATION OF LARGE METERS INCLUDING VAULTS, VALVES & BYPASS PIPING up to 20 ft. 12 Meter Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 7: NEW INSTALLATION OF TO 2 METERS AND TAPS IN CONJUNCTION WITH NEW LARGE METER OR DUAL CHECK ON - 1 INSTALLATION ONLY or 1 Tap and Meter Installation up to 15 ft of copper tubing Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 8: NEW INSTALLATION OF TO 2 METERS AND TAPS IN CONJUNCTION WITH NEW LARGE METER OR DUAL CHECK ON - 1 INSTALLATION ONLY 1 or 2 Tap and Installation p to 15ft of copper tubing Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 9: NEW INSTALLATION OF TO 2 METERS AND TAPS IN CONJUNCTION WITH NEW LARGE METER OR DUAL CHECK ON - 1 INSTALLATION ONLY Copper tubing installation after 15 ft Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 10: NEW INSTALLATION OF TO 2 METERS AND TAPS IN CONJUNCTION WITH NEW LARGE METER OR DUAL CHECK ON - 1 INSTALLATION ONLY 1 Copper tubing installation after 15 ft Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 11: NEW INSTALLATION OF TO 2 METERS AND TAPS IN CONJUNCTION WITH NEW LARGE METER OR DUAL CHECK ON - 1 INSTALLATION ONLY 1 Copper tubing installation after 15 ft Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 12: NEW INSTALLATION OF TO 2 METERS AND TAPS IN CONJUNCTION WITH NEW LARGE METER OR DUAL CHECK ON - 1 INSTALLATION ONLY 2 Copper tubing installation 15 ft Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 13: Replacement of Large Meters only 3 meter Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 14: Replacement of Large Meters only 4 meter Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 15: Replacement of Large Meters only 6 meter Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 16: Replacement of Large Meters only 8 meter Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 17: Replacement of Large Meters only 10 meter Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 18: Replacement of Large Meters including Vaults, Valves & Bypass Piping 3 meter, vault, valves, bypass Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 19: Replacement of Large Meters including Vaults, Valves & Bypass Piping 4 meter, vault, valves, bypass Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 20: Replacement of Large Meters including Vaults, Valves & Bypass Piping 6 meter, vault, valves, bypass Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 21: Replacement of Large Meters including Vaults, Valves & Bypass Piping 8 meter, vault, valves, bypass Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 22: Replacement of Large Meters including Vaults, Valves & Bypass Piping 10 meter, vault, valves, bypass Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 23: Replacement Of Large Meters Including Valves & Bypass Piping ( Swap) 3 meter, valves, bypass Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 24: Replacement Of Large Meters Including Valves & Bypass Piping ( Swap) 4 meter, valves, bypass Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 25: Replacement Of Large Meters Including Valves & Bypass Piping ( Swap) 6 meter, valves, bypass Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 26: Replacement Of Large Meters Including Valves & Bypass Piping ( Swap) 8 meter, valves, bypass Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 27: Replacement Of Large Meters Including Valves & Bypass Piping ( Swap) 10 meter, valves, bypass Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 28: PIPE INSTALLATION IN CONJUNCTION WITH LARGE METER INSTALLATION OVER 20 ft. Installing 6 Ductile Iron Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 29: PIPE INSTALLATION IN CONJUNCTION WITH LARGE METER INSTALLATION OVER 20 ft. Installing 8 Ductile Iron Pipe Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 30: PIPE INSTALLATION IN CONJUNCTION WITH LARGE METER INSTALLATION OVER 20 ft. Installing 10 Ductile Iron Pipe Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 31: PIPE INSTALLATION IN CONJUNCTION WITH LARGE METER INSTALLATION OVER 20 ft. Installing 12" Ductile Iron Pipe Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 32: Meter Vault & LID Replacement Medium vault, 108 x60 inside dimension Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 33: Meter Vault & LID Replacement Large vault, 144 x72 inside dimension Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 34: Meter and Double Detector Check ( DDC) Vault Adjustment Medium vault adjustment to grade ( up) Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 35: Meter and Double Detector Check ( DDC) Vault Adjustment Large vault adjustment to grade ( up) Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 36: SINGLE VALVE REPLACEMENT ON EXISTING METERS 3 valve Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 37: SINGLE VALVE REPLACEMENT ON EXISTING METERS 4 valve Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 38: SINGLE VALVE REPLACEMENT ON EXISTING METERS 6 valve Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 39: SINGLE VALVE REPLACEMENT ON EXISTING METERS 8 valve Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 40: SINGLE VALVE REPLACEMENT ON EXISTING METERS 10 valve Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 41: SINGLE VALVE REPLACEMENT ON EXISTING METERS 12 valve Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 42: CUT IN OF VALVES IN CONJUNCTION WITH EITHER NEW METER INSTALLATION OR METER REPLACEMENT Install 3 Gate valve w/valve box Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 43: CUT IN OF VALVES IN CONJUNCTION WITH EITHER NEW METER INSTALLATION OR METER REPLACEMENT Install 4 Gate valve w/valve box Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 44: CUT IN OF VALVES IN CONJUNCTION WITH EITHER NEW METER INSTALLATION OR METER REPLACEMENT Install 6 Gate valve w/valve box Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 45: CUT IN OF VALVES IN CONJUNCTION WITH EITHER NEW METER INSTALLATION OR METER REPLACEMENT Install 8 Gate valve w/valve box Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 46: CUT IN OF VALVES IN CONJUNCTION WITH EITHER NEW METER INSTALLATION OR METER REPLACEMENT Install 10 Gate valve w/valve box Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 47: CUT IN OF VALVES IN CONJUNCTION WITH EITHER NEW METER INSTALLATION OR METER REPLACEMENT Install 12" Gate valve w/valve box Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 48: INSTALLATION OF CASING AND CARRIER PIPE 8- inch DIP in 12 Bored Casing with 0. 33 Wall Thickness Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 49: INSTALLATION OF CASING AND CARRIER PIPE 10inch DIP in 16 Bored Casing with **** Wall Thickness Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 50: INSTALLATION OF CASING AND CARRIER PIPE 12- inch DIP in 20 Bored Casing with **** Wall Thickness Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 51: INSTALLATION OF CASING AND CARRIER PIPE 8- inch DIP in 12 Direct Bury Casing with 0. 33 Wall Thickness Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 52: INSTALLATION OF CASING AND CARRIER PIPE 10- inch DIP in 16 Direct Bury Casing with **** Wall Thickness Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 53: INSTALLATION OF CASING AND CARRIER PIPE 12- inch DIP in 20 Direct Bury Casing with **** Wall Thickness Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 54: FIRE HYDRANT INSTALLATION, RELOCATION AND HEIGHT ADJUSTMENT IN CONJUNCTION WITH METER INSTALLATION Fire Hydrant Installation ( 0- 4 bury depth) Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 55: FIRE HYDRANT INSTALLATION, RELOCATION AND HEIGHT ADJUSTMENT IN CONJUNCTION WITH METER INSTALLATION Fire Hydrant Relocation ( 0- 20 distance from existing hydrant) Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 56: FIRE HYDRANT INSTALLATION, RELOCATION AND HEIGHT ADJUSTMENT IN CONJUNCTION WITH METER INSTALLATION Install 6 Fire Hydrant Extension Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 57: FIRE HYDRANT INSTALLATION, RELOCATION AND HEIGHT ADJUSTMENT IN CONJUNCTION WITH METER INSTALLATION Install 12 Fire Hydrant Extension Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 58: FIRE HYDRANT INSTALLATION, RELOCATION AND HEIGHT ADJUSTMENT IN CONJUNCTION WITH METER INSTALLATION Install 18 Fire Hydrant Extension Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 59: FIRE HYDRANT INSTALLATION, RELOCATION AND HEIGHT ADJUSTMENT IN CONJUNCTION WITH METER INSTALLATION Install 24 Fire Hydrant Extension Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 60: FIRE HYDRANT INSTALLATION, RELOCATION AND HEIGHT ADJUSTMENT IN CONJUNCTION WITH METER INSTALLATION Install 36 Fire Hydrant Extension Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 61: WET TAPPING, VALVE AND VALVE BOX IN CONJUNCTION WITH EITHER NEW METER 6 X6 Insallation or Meter Replacement Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 62: WET TAPPING, VALVE AND VALVE BOX IN CONJUNCTION WITH EITHER NEW METER 6 X8 Insallation or Meter Replacement Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 63: WET TAPPING, VALVE AND VALVE BOX IN CONJUNCTION WITH EITHER NEW METER 6 x10 Insallation or Meter Replacement Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 64: WET TAPPING, VALVE AND VALVE BOX IN CONJUNCTION WITH EITHER NEW METER 6 x12 Insallation or Meter Replacement Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 65: WET TAPPING, VALVE AND VALVE BOX IN CONJUNCTION WITH EITHER NEW METER 6 x16 Insallation or Meter Replacement Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 66: WET TAPPING, VALVE AND VALVE BOX IN CONJUNCTION WITH EITHER NEW METER 6 x24 Insallation or Meter Replacement Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 67: WET TAPPING, VALVE AND VALVE BOX IN CONJUNCTION WITH EITHER NEW METER 8 x8 Insallation or Meter Replacement Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 68: WET TAPPING, VALVE AND VALVE BOX IN CONJUNCTION WITH EITHER NEW METER 8 x10 Insallation or Meter Replacement Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 69: WET TAPPING, VALVE AND VALVE BOX IN CONJUNCTION WITH EITHER NEW METER 8 x12 Insallation or Meter Replacement Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 70: WET TAPPING, VALVE AND VALVE BOX IN CONJUNCTION WITH EITHER NEW METER 8 x16 Insallation or Meter Replacement Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 71: WET TAPPING, VALVE AND VALVE BOX IN CONJUNCTION WITH EITHER NEW METER 8 x24 Insallation or Meter Replacement Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 72: WET TAPPING, VALVE AND VALVE BOX IN CONJUNCTION WITH EITHER NEW METER 10 x10 Insallation or Meter Replacement Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 73: WET TAPPING, VALVE AND VALVE BOX IN CONJUNCTION WITH EITHER NEW METER 10 x12 Insallation or Meter Replacement Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 74: WET TAPPING, VALVE AND VALVE BOX IN CONJUNCTION WITH EITHER NEW METER 10 x16 Insallation or Meter Replacement Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 75: WET TAPPING, VALVE AND VALVE BOX IN CONJUNCTION WITH EITHER NEW METER 10 x24 Insallation or Meter Replacement Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 76: WET TAPPING, VALVE AND VALVE BOX IN CONJUNCTION WITH EITHER NEW METER 12 x12 Insallation or Meter Replacement Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 77: WET TAPPING, VALVE AND VALVE BOX IN CONJUNCTION WITH EITHER NEW METER 12 x16 Insallation or Meter Replacement Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 78: WET TAPPING, VALVE AND VALVE BOX IN CONJUNCTION WITH EITHER NEW METER 12 x24 Insallation or Meter Replacement Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 79: CONCRETE THRUST BLOCK INSTALLATION IN CONJUNCTION WITH EITHER NEW METER Concrete Thrust Block Installation or Meter Replacement Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 80: CONCRETE & ASPHALT SIDEWALKS, DRIVEWAYS, CURBS AND GUTTERS & STREET & ROAD PAVEMENT REPLACEMENT AND FINISH IN CONJUNCTION WITH EITHER NEW METER INSTALLATION OR METER REPLACEMENT Remove & Replace Concrete Curb Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 81: CONCRETE & ASPHALT SIDEWALKS, DRIVEWAYS, CURBS AND GUTTERS & STREET & ROAD PAVEMENT REPLACEMENT AND FINISH IN CONJUNCTION WITH EITHER NEW METER INSTALLATION OR METER REPLACEMENT Remove & Replace Granite Curb Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 82: CONCRETE & ASPHALT SIDEWALKS, DRIVEWAYS, CURBS AND GUTTERS & STREET & ROAD PAVEMENT REPLACEMENT AND FINISH IN CONJUNCTION WITH EITHER NEW METER INSTALLATION OR METER REPLACEMENT Remove & Replace Concrete Driveway Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 83: CONCRETE & ASPHALT SIDEWALKS, DRIVEWAYS, CURBS AND GUTTERS & STREET & ROAD PAVEMENT REPLACEMENT AND FINISH IN CONJUNCTION WITH EITHER NEW METER INSTALLATION OR METER REPLACEMENT Remove & Replace Asphalt Driveway Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 84: CONCRETE & ASPHALT SIDEWALKS, DRIVEWAYS, CURBS AND GUTTERS & STREET & ROAD PAVEMENT REPLACEMENT AND FINISH IN CONJUNCTION WITH EITHER NEW METER INSTALLATION OR METER REPLACEMENT Remove & Replace Gravel Driveway Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 85: CONCRETE & ASPHALT SIDEWALKS, DRIVEWAYS, CURBS AND GUTTERS & STREET & ROAD PAVEMENT REPLACEMENT AND FINISH IN CONJUNCTION WITH EITHER NEW METER INSTALLATION OR METER REPLACEMENT Remove & Replace Decorative Paver Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 86: CONCRETE & ASPHALT SIDEWALKS, DRIVEWAYS, CURBS AND GUTTERS & STREET & ROAD PAVEMENT REPLACEMENT AND FINISH IN CONJUNCTION WITH EITHER NEW METER INSTALLATION OR METER REPLACEMENT Remove & Replace Brick Driveway Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 87: CONCRETE & ASPHALT SIDEWALKS, DRIVEWAYS, CURBS AND GUTTERS & STREET & ROAD PAVEMENT REPLACEMENT AND FINISH IN CONJUNCTION WITH EITHER NEW METER INSTALLATION OR METER REPLACEMENT Remove & Replace Concrete Sidewalk Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 88: CONCRETE & ASPHALT SIDEWALKS, DRIVEWAYS, CURBS AND GUTTERS & STREET & ROAD PAVEMENT REPLACEMENT AND FINISH IN CONJUNCTION WITH EITHER NEW METER INSTALLATION OR METER REPLACEMENT Remove & Replace Concrete Sidewalk Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 89: CONCRETE & ASPHALT SIDEWALKS, DRIVEWAYS, CURBS AND GUTTERS & STREET & ROAD PAVEMENT REPLACEMENT AND FINISH IN CONJUNCTION WITH EITHER NEW METER INSTALLATION OR METER REPLACEMENT Remove & Replace Concrete Pavement Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 90: CONCRETE & ASPHALT SIDEWALKS, DRIVEWAYS, CURBS AND GUTTERS & STREET & ROAD PAVEMENT REPLACEMENT AND FINISH IN CONJUNCTION WITH EITHER NEW METER INSTALLATION OR METER REPLACEMENT Remove & Replace Asphalt Pavement Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 91: CONCRETE & ASPHALT SIDEWALKS, DRIVEWAYS, CURBS AND GUTTERS & STREET & ROAD PAVEMENT REPLACEMENT AND FINISH IN CONJUNCTION WITH EITHER NEW METER INSTALLATION OR METER REPLACEMENT Asphalt Milling & Overlay Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 92: CONCRETE & ASPHALT SIDEWALKS, DRIVEWAYS, CURBS AND GUTTERS & STREET & ROAD PAVEMENT REPLACEMENT AND FINISH IN CONJUNCTION WITH EITHER NEW METER INSTALLATION OR METER REPLACEMENT FC Standard Utility Cut Replacement Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 93: CONCRETE & ASPHALT SIDEWALKS, DRIVEWAYS, CURBS AND GUTTERS & STREET & ROAD PAVEMENT REPLACEMENT AND FINISH IN CONJUNCTION WITH EITHER NEW METER INSTALLATION OR METER REPLACEMENT 1 in Type E Asphalt Topping Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 94: LABOR AND EQUIPMENT IN CONJUNCTION WITH NEW METER INSTALLATION OR METER REPLACEMENT ( PREMIUM SERVICES) After Normal Hours Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 95: LABOR AND EQUIPMENT IN CONJUNCTION WITH NEW METER INSTALLATION OR METER REPLACEMENT ( PREMIUM SERVICES) Weekends and Holidays Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 96: LABOR AND EQUIPMENT IN CONJUNCTION WITH NEW METER INSTALLATION OR METER REPLACEMENT ( PREMIUM SERVICES) Other Work Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 97: EROSION AND SEDIMENT CONTROL ( FOR ITEMS NOT INCLUDED IN BID SHEETW) Temporary Grassing Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 98: EROSION AND SEDIMENT CONTROL ( FOR ITEMS NOT INCLUDED IN BID SHEETW) Type A Silt Fence Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 99: EROSION AND SEDIMENT CONTROL ( FOR ITEMS NOT INCLUDED IN BID SHEETW) Type B Silt Fence Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 100: EROSION AND SEDIMENT CONTROL ( FOR ITEMS NOT INCLUDED IN BID SHEETW) Type C Silt Fence Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 101: EROSION AND SEDIMENT CONTROL ( FOR ITEMS NOT INCLUDED IN BID SHEETW) Staked Hay Bales Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 102: EROSION AND SEDIMENT CONTROL ( FOR ITEMS NOT INCLUDED IN BID SHEETW) Dirt Bag ( silt control pumping system) Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 103: EROSION AND SEDIMENT CONTROL ( FOR ITEMS NOT INCLUDED IN BID SHEETW) Replacement of SOD Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 104: Tree Protection Fence ( active) Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 105: Tree Protection Fence ( passive) Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 106: Tree removal, easy access Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 107: Tree removal, difficult access Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 108: Excavation and removal of rock Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 109: Equipment and Operator Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 110: Trip Fee Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 111: Trench Stabilization Suitable Earth Materials ( borrow) Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 112: Trench Stabilization Crusher Run Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 113: Trench Stabilization Crushed Stone, No. 57 Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 114: Trench Stabilization M- 10 Sand Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 115: REMOVE AND REPLACE EXISTING FENCE 4- ft High Chain Link Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 116: REMOVE AND REPLACE EXISTING FENCE 6- ft High Chain Link Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 117: REMOVE AND REPLACE EXISTING FENCE 4- ft High Wood Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 118: REMOVE AND REPLACE EXISTING FENCE 6- ft High Wood Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 119: Traffic Control - Std. DOT Barrier Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 120: Traffic Control - MUTCD Std. Safety Barrel Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 121: Traffic Control - Police Cruiser Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 122: Traffic Control - Certified Flagman Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 123: Traffic Control - Light Plant Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

Lot 124: Traffic Control - Electronic Message Board Manufacturer All Brands are acceptable Brand Preference Brand Name or Equivalent

More bid opportunities are waiting for you!
Start your free 14-day trial to see all results and access the bid documents.

Get bid alerts running in 3 simple steps

  1. Tell us what you sell

    Add keywords for your products or services. Smart Search helps catch related opportunities beyond exact matches.

  2. Start the trial and receive alerts

    Use the 14-day free trial and get email alerts with documents or official posting links.

  3. Tune your feed

    Adjust keywords, regions, email schedule and email style. Use map view and filters when you want to explore.

User testimonials
We selected the most helpful reviews from real users. Order may change periodically.
The tool is truly effective at scanning bid documents, efficiently delivering bids.
G. D. Reis
I like the way they provide information with the greatest possible accuracy. I love that.
M. A. Neil
I closed deals thanks to the information gathered by the search tool. There’s no need to research across multiple media outlets.
J. Comunale
You see a lot of tenders; you get emails with the alerts.
M. Camarasa
I liked the way they search for bids and provide us with the link to view them.
C. J. P. Perez
Excellent information. Just what I was looking for.
L. H. Borrelli
I consistently received notifications about bids within the specific segment I chose to monitor. The system simplifies processes that used to be complex, offering a navigation experience that is easy, fast, and modern.
G. P. da S. E. Guimaraes
Very efficient: I receive the bids quickly.
J. P. R. Rivera
Efficiency in search times.
R. Chavez
The idea of ​​using a keyword and sending the information by email is very good.
U. Solutions
I’m notified immediately about every bid that opens in my area. It really helps my work.
E. Goncalves
It is complete and optimal, it improves my time.
R. de L. Cruz
It encompasses all portals in one place.
G. Ferrea

Why use BidHits for government bidding

For teams and integrations

Send bid data into your CRM, BI or internal workflow via the Bid API, with JSON or XML output.
View API documentation

Frequently asked questions

BidHits is a government bid search engine that monitors official portals and brings relevant federal, state and local opportunities into one place. You can search on the site and receive scheduled email alerts.

Enter your email and activate the trial. For 14 days you can use the main features, including alerts and access to results. When it ends, if you do not subscribe at /subscription.php, the bid list becomes limited and you will not be charged automatically.

1) Add keywords that describe what you sell. 2) Start the trial. 3) Adjust regions, delivery times and email style after signup.

Whenever possible, yes. Some official portals require login or block direct links; in those cases we point you to the official process page so you can download the documents.

Yes. You can filter by region, procurement method, dates and value ranges. You can also save preferences for future alerts and searches.

Yes. In the dashboard you can see bids on a map and use it to plan follow-up by location.

It can happen. Smart Search uses your keywords to find related opportunities, not only exact matches. Add specific terms and remove off-topic results to improve future alerts.

Yes. You can query bids via API. Documentation at /api_integration.php. Ideal for CRM, BI and automations.

In Settings you can pause alerts or adjust delivery times. If you want to delete your account, just contact us. During the free trial there is no auto-charge.

We monitor major official sources every day at the federal, state and local levels. New bid notices are added as soon as they are captured from the source portal.

Plans start at $ 43.00 per month, with options for different business needs and billing terms. Start with a free trial and evaluate the results before subscribing, with no automatic billing.

See how it works

Start free trial

Add what you sell, get scheduled alerts, open documents or the official page, and use filters by region and method.

Transcript
Welcome to BidHits. Finding public tenders and bids is important. But what really matters is quickly identifying the opportunities that match what your company sells. To get started, enter a few keywords that describe your products or services. BidHits shows relevant opportunities, highlights your keywords, and organizes everything by date. Smart search is already enabled and uses artificial intelligence to expand your results, even when the tender uses different words from the ones you searched for. For each opportunity, you can view a summary, access documents, mark it as a favorite, add private notes, remove what is not relevant, or view it on the map. You can also use filters, run searches, and explore the day's opportunities directly on the map. Start using BidHits now. It's fast, practical, and you can try it for free.
AI Assistant
Ask me about the bid...
Loading summary...