Colorado State University is seeking bids for the IDRC Phase III chilled water connection project. The scope includes materials and installation to connect to the foothills chilled water utility and replace existing chillers. A mandatory pre-bid conference and site tour will be held on August 6, 2026. Bid submittals are due August 19, 2026. The estimated project cost is $614,**** must meet minimum requirements, including demonstrated bonding capability and experience with projects over $500,000. Colorado labor preference applies. Bid security of 5% is required for projects $50,000 or greater.
Anticipated substantial completion is November 1, 2026, and anticipated final acceptance is November 30, 2026.
The scope of services includes the warranty period to the state as per the advertisement for bid.
The contract will be awarded to the lowest responsible bidder, taking into account the Colorado resident bidder preference.
Bidders must demonstrate specific contracting experience in projects of similar scope and complexity for at least two projects each in excess of $500,000 hard costs, and have demonstrated bonding capability up to $650,000.
The bidder represents that Article 7d of the Contractors Agreement SC6. 21 has been reviewed to determine the type and amount of any liquidated damages that may be specified for this contract.
A mandatory pre-bid site walk will be held on August 6, 2026, at 9:00 AM MT at **** Rampart Road, Fort Collins, CO ****, meeting in the north parking lot.
Requests for clarifications are due August 10, 2026, 12:00 PM MT.
Late submittals shall not be evaluated. Bids with exclusions or clarifications will be set aside and not read or included in the bid tabulation. Exceptions to the advertisement for bids document and/or modification of the bid will render the proposal nonresponsive.
The estimated project cost is $614,****.