The contractor shall provide all labor, material, equipment, and supervision to construct an approximately 790 sf addition to bldg. 100 for the ed ct replacement in accordance with plans and specifications. This will include but not limited to removal and replacement of ct scanner equipment in room **** and associated support spaces, to be renamed suite 1e222. The space is in area h between ef 68. As the area serving the ct scanner will be increasing, additional lead lined walls will be required. The gantry and patient table will be supported directly by the 1st floor, while other ceiling hung equipment will need to be structurally supported to the 1st floor interstitial framing. The project is set aside for verified servicedisabled veteranowned small business sdvosb. The cutoff for submission of rfis is **** at 2: 00pm est. An organized site visit is scheduled for **** at 09: 00 am est. Offers providing less than one hundred and twenty 120 calendar days for government acceptance after the date offers are due will not be considered and will be rejected. A payment and performance bond shall be provided within ten 10 calendar days of award of the contract. The amount of the bid guarantee shall be 20 percent of the bid price or 3, 000, 000, whichever is less. Offerors shall submit information that specify the contractor in question has no more than three serious, or one repeat, or one willful osha or epa violations in the past three 3 years and has an experience modification rate emr that shall not exceed 1. 0. Wages for all contractors and subcontractors must comply with davis bacon wage determinations. The current davis bacon determination is general decision number: **** 05232025. The government will award one 1 firmfixed price contract resulting from this solicitation to the responsible offeror whose offer, conforming to the solicitation, will be most advantageous to the government, all evaluation factors other than cost or price, when combined, are approximately equal to cost or price.
The performance period shall be commenced upon receipt of written notice to proceed ntp performed in concurrent or sequential phases as indicated or required. Refer to ****, block 11, for contract performance period.
The contractor shall be paid monthly upon submission of proper invoices for work completed. The contractor shall be paid monthly upon submission of proper invoices for work completed.
The government will award one 1 firmfixed price contract resulting from this solicitation to the responsible offeror whose offer, conforming to the solicitation, will be most advantageous to the government, all evaluation factors other than cost or price, when combined, are approximately equal to cost or price. The government will award one 1 firmfixed price contract resulting from this solicitation to the responsible offeror whose offer, conforming to the solicitation, will be most advantageous to the government, all evaluation factors other than cost or price, when combined, are approximately equal to cost or price.
Quotes submitted by noncertified by small business search https:search. certifications. sba. gov shall be excluded from award consideration. Quotes submitted by noncertified by small business search https:search. certifications. sba. gov shall be excluded from award consideration.
An organized site visit is scheduled for **** at 09: 00 am est. An organized site visit is scheduled for **** at 09: 00 am est.
The cutoff for submission of rfis is **** at 2: 00pm est. The cutoff for submission of rfis is **** at 2: 00pm est, email to david. hernandez1@va. gov.
The magnitude of this project is between 500, **** and 1, 000, ****. Magnitude of this project: between 500, **** and 1, 000, ****