Lot 1: Mobilization
Lot 2: Bonds & Insurance
Lot 3: Construction Staking/As- Built
Lot 4: Construction Traffic Control
Lot 5: Construction Sign, Complete in Place
Lot 6: 16" Steel Casing by Trench & Fill, Complete in Place
Lot 7: 10" PVC C900 DR 18, Materials
Lot 8: 10" PVC C900 DR 18, Installation by Trench & Fill ( Complete in Place)
Lot 9: 8" PVC C900 DR 18, Materials
Lot 10: 8" PVC C900 DR 18, Installation by Trench & Fill ( Complete in Place)
Lot 11: 6" PVC C900 DR 18, Materials
Lot 12: 6" PVC C900 DR 18, Installation by Trench & Fill ( Complete in Place)
Lot 13: Fire Hydrant Assembly with Valve, Complete in Place
Lot 14: Ductile Iron Fittings
Lot 15: Type A Aggregate Backfill Under Pavement ( 0. 85 ton/yd3)
Lot 16: 2" Poly Pipe, Complete in Place
Lot 17: 10" Gate Valve & Box Complete in Place
Lot 18: 8" Gate Valve & Box Complete in Place
Lot 19: Tie into Existing Waterline
Lot 20: Pressure Testing and Disinfection Complete in Place
Lot 21: Concrete Street, Complete in Place
Lot 22: Concrete Sidewalk Repair, Complete in place
Lot 23: Solid Slab Sodding
Lot 24: * Additional Concrete Repair, Complete in Place