Sealed proposals due December 2, 2026 at 3:00 PM EST. Design, deliver and install two playgrounds (ages 2-5 and 5-12) at Copeland Elementary School. Budget of $200,000. Delivery and installation within 90 days of award. IPEMA certification and ASTM compliance required. 10-year warranty on structures and surfacing. 5-year non-prorated warranty on rubber surfacing. 3-year warranty on subgrade. Certified playground safety inspectors required for installation. Questions due November 18, 2026. Award expected December 15, 2026.
The awarded vendor is expected to provide delivery and installation within 90 days of award notification. delivery and installation are to be coordinated with mr. david perry
Playground structures and safety surfacing must be free of defects for a minimum of 10 years. free of structural defects, environmental degradation, and manufacturing errors for a minimum period of ten 10 years
Installation must be by certified playground safety inspectors. physical installation of the play structures must be executed exclusively by crews certified as certified playground safety inspectors cpsi
Failure to perform or deliver within required time constitutes material breach. failure of the successful vendor to perform contracted service or deliver the merchandise within the required time shall constitute a material breach of contract
Site visits are encouraged prior to proposal submission. site visits are encouraged prior to proposal submission
Samples for verification are required for color selections. samples for verification: color selections for upright posts, steel accessories, freestanding panels signs, swings, plastic components
Questions must be submitted by November 18, 2026 at 5:00 PM. all requests for clarification or interpretation must be submitted to the business office on or before the close of business november 18, 2026, 5: 00 p. m.
Late bids will be disqualified. late bids and proposals will not be accepted and will automatically be disqualified from bid consideration
A budget of $200,000 has been allocated. a budget of 200, 000 has been allocated for the school listed above