City Of Farmington - NM
N. Dustin 8" Waterline Replacement ( 30th St to 35th St) - The City of Farmington, New Mexico (" OWNER") is requesting Bids to furnish all labor, equipment, and materials to replace 1, 680 linear feet of the aging 8- inch asbestos cement water main with new 8- inch PVC pipe. All components will be fully removed and replaced to ensure reliability and meet safety standards. Unless otherwise stated in the Contract Documents, Engineering for this project, along with the Contract Documents, were completed by the
Waterline Replacement 1 8 pvc water main dr18 2 6 pvc water main dr18 3 8 gate valve with box 4 cut and cap existing watermain 5 iron fittings, 12 dia. under 6 6 megalug ductile or pvc 7 8 megalug ductile or pvc 8 water service connection new main to existing meter can to remain in place 58 or 1 9 addl length of service pipe for 58 1 services 1 phys. separate existing waterline to cut in valve or fitting, all sizes and types 1 air relief valve assembly inc. vault 14 pipe or larger 1 load, haul dispose unsuitable material 10 mile free haul 1 pipe bedding material for pipe trench 1 2 standard curb gutter rem. , disp. rplce 1 6 drivepad or valley gutter removal, disposal, replacement 1 subgrade prep 1 base course in place 1 asphalt removal disposal, 10 mile free haul 1 hot mix sp iv or equivalent 2 traffic control 2 testing allowance 2 portable toilet 2 mobilization and demobilization
Bid Close Date: