Town Of Suffield - CT
Concrete Sidewalks/ Retaining Walls
Town of Suffield - New Sidewalk along Mapleton Avenue - The project involves the construction of approximately 2, 200 feet of concrete sidewalks along with drainage improvements and two retaining walls. Sidewalk construction includes: driveway paving as required for areas disturbed by work. Drainage work includes: installation of one catch basin, 1 pipe end and 50 feet of storm drain pipe. Retaining wall includes an approximately 150 feet long by 2. 5 feet high retaining wall with a chain link fence within
Sidewalk construction, drainage improvements, retaining walls Construction of approximately 2, 200 feet of concrete sidewalks along Mapleton Avenue, including driveway paving as required for disturbed areas. Drainage work includes installing one catch basin, 1 pipe end, and 50 feet of storm drain pipe. Retaining wall construction involves an approximately 150 feet long by 2. 5 feet high retaining wall with a chain link fence, and removal/replacement of a retaining wall for a driveway turnaround at 400 Mapleton Avenue.
Bid Close Date: