BidHits™ uses cookies to provide an individualized service and care for the privacy and protection of shared data.
By browsing this site, we understand that you agree to the terms of our Privacy Policy.
Concrete Bunkers Government Bids & RFPs
Government bid alerts, regional filters, and fast access to documents
Monitor more sources with less manual work. 14-day free trial, no auto-charge.
90% recommend BidHits™ (1053 real users, 05/21/2026).Methodology
Concrete Installation/ Precast Concrete Elements/ Hand Grenade Bunkers
Construct two Standard Design Trench Lines, Range 305, Grafenwoehr Training Area - This project includes the following work: tExcavation work in the area of entries/exits, bunkers and main trench. tInstallation of precast concrete elements.
construction of tunnels and subsurface structures excavation work in the area of entries exits, bunkers and main trench. installation of precast concrete elements. wooden covering of the precast concrete elements. install gravel basalt by manual excavation. install 2 ea hand grenade bunkers.
Training Support to Master Breacher Course - Training Support for the Master Breacher Course ran by the 75th Ranger Regiment on Fort Benning GA. Scope Specific Specialized Requirements: Minimum of 10 years of special operations experience with intimate knowledge of 75th Rang
Performance Work Statement Regimental Master Breacher Course Range Support Door hanger rack, wall hanger rack, construction of targets, 2 target vehicles, doors and windows, concrete walls, cinder block walls, red brick walls, race walls, sandbag bunkers, shoulder fired range and target materials.
AI helper
The contractor will provide target support and construction of training aids for the Regimental Master Breacher Course. The period of performance includes a base year with a minimum of 3 courses per year. The contractor must develop and maintain a Quality Control Plan (QCP) and adhere to security requirements. The government will provide access to ranges and guidance before and inspect all services after the construction of all targetry to ensure accurate and total construction. The contractor must furnish all supplies, equipment, and services not listed in parts 4 and 5 of the PWS. The contractor shall provide all necessary equipment and materials to complete construction of the following targets prior to the beginning of each course, to include: heavy demolitions area: 2 target vehicles. The contractor shall be responsible of the removal of all used vehicles and dumpsters from the facilities upon completion of each course. The contractor shall provide signed nondisclosure agreements to the government at the start of each government fiscal year and any new employees to contracting company or subcontracted personnel before they can begin commencement of work under the contract. Disclosure of information by contractor personnel may result in removal of contractor personnel from performance under this contract. The contractor shall notify the contracting officer immediately whenever it becomes aware that such access or participation may result in any actual or potential oci and shall promptly submit a plan to the contracting officer to avoid or mitigate any such oci. The contractors oci mitigation plan will be determined to be acceptable solely at the discretion of the contracting officer. In the event the contracting officer unilaterally determines that any such oci cannot be satisfactorily avoided or mitigated, the contracting officer may affect other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the oci. The contractor shall have personnel on board, during the thirty 30 day phase in phase out periods. During the phase in period, the contractor shall become familiar with performance requirements to commence full performance of services on the contract start date. The contractor shall comply with far ****, accident prevention november ****, the references contained therein e. g. u. s. army corps of engineers safety and health requirements manual em 38511. The contractor shall ensure that all of its operations and activities conform to the installation environmental policy requirements. The contractor shall ensure that all contract personnel have received appropriate levels of training in the handling, use, storage, and disposal of hazardous material. In addition, the contractor shall ensure that all contractor controlled activities on us installations are conducted in accordance with the instillation spill prevention and response plan, solid waste policy, final governing standards, and applicable environmental lawsstandards. The contractor shall provide signed nondisclosure agreements to the government no later than five days prior to commencement of work under the contract. Disclosure of information by contractor personnel may result in removal of contractor personnel from performance under this contract. The contractor shall provide signed nondisclosure agreements to the government at the start of each government fiscal year and any new employees to contracting company or subcontracted personnel before they can begin commencement of work under the contract. Disclosure of information by contractor personnel may result in removal of contractor personnel from performance under this contract. The contractor shall notify the contracting officer immediately whenever it becomes aware that such access or participation may result in any actual or potential oci and shall promptly submit a plan to the contracting officer
The bid notice states deliverables for potential fourth courses will be communicated to the contractor no less than 90 days prior to the beginning of a fourth course.
The bid notice states minimum of 10 years of special operations experience with intimate knowledge of 75th ranger regiment breaching tactics, techniques, and procedures ttps.
BID 25- 78 Carey Park Golf Course Master Plan Phase 6
1 tree clearing 2 ea 2 mass grading cy 3 drainage inlet 12 9 ea 4 4 perforated pipe bunkers 305 lin ft 5 4 perforated pipe greens 890 lin ft 6 6 solid drain pipe 1, 160 lin ft 7 8 solid drain pipe 120 lin ft 8 drainage discharge 7 ea 9 greens construction 10, 100 sq ft 10 bunker construction sand 5, 020 sq ft 11 waste bunker construction native sand 26, 300 sq ft 12 grassing sod tees zoyzia 15, 600 sq ft 13 grassing sod fairway surrounds zoyzia 29, 300 sq ft 14 grassing sod fescue 54, 300 sq ft 15 grassing seeding fescue 108, 300 sq ft 16 new concrete cart path 1, 585 sq ft 17 6 concrere cartpath curbing 90 lin ft
Port of Pensacola Paving and Rail Rehabilitation Project - SCOPE OF WORK The Scope of Work for the Port of Pensacola Paving & Rail Rehabilitation Project, which is federally funded through the Community Development Block Grant - Disaster Recovery Funds ( CDBG- DR) and the Florida Department of Transportation Florida Seaport Transportation and Economic Development Funds ( FSTED), consists of the following tasks: The removal, disposal and replacement of the existing on- Port railroad track systems as shown on
Port of Pensacola Paving and Rail Rehabilitation Project The scope of work consists of the following tasks: - Removal, disposal and replacement of the existing onport railroad track systems. - Removal and disposal or abandonment and grout fill of the existing underground potable water system. - Furnish and install new potable and firewater system. - Removal and disposal of the existing backflow preventer. - Furnish and install new backflow preventer. - Removal and disposal of portions of the existing stormwater collection system and the furnishing and installation of new stormwater collections systems. - Removal, disposal and replacement of the existing ships water concrete bunkers at berths 2, 3 5. - Repairs to existing dock structure expansion joints. - Removal and disposal of existing asphalt pavement and base material. - Grading and compaction of existing subgrade and furnish and install new asphalt and concrete pavement and base material. - Remove and dispose of existing cables and furnish and install ne
AI helper
An optional prebid meeting will be held at 10:00 a. m. , central time, November 13, 2025 in the Port of Pensacola conference room, 2nd floor port administration building, 700 S barracks street, Pensacola, FL and via Microsoft Teams.
The bid notice states onmandatory an optional prebid meeting will be held at 10: 00 a. m. , central time, november 13, 2025 in the port of pensacola conference room, 2nd floor port administration building, 700 s barracks street, pensacola, fl and via microsoft teams, participation details in bid package.
The bid notice states projectestimatedbudget: 0. 0.
Training Range Support - THIS IS A CURRENT DRAFT The contractor will be required to provide materials, construction and general labor support to unit Master Breacher Training in Fort Benning GA. 4. CONTRACTOR FURNISH
construction of miscellaneous buildings 4 medium weight doors with all hardware 76 heavy fire filled wood doors with all hardware 36 light metal doors with all hardware 20 heavy metal doors with all hardware 10 heavy metal middle eastern type custom fabricated doors 8 jail door type custom fabricated to specifications 9 4l x 6h x 6 w concrete rebar reinforced walls 1 8 x8x8 high strength concrete rebar reinforced wall 1 10 x8x8 high strength concrete rebar reinforced wall 1 12 x8x8 high strength concrete rebar reinforced wall 1 8x8 concrete filled cinder block walls 1 8x8 unfilled cinder block walls 1 8x8 double thickness red brick walls 4 race walls 1 **** wood stud framed sheeted with 3 4 plywood sandbag bunkers 2 **** unfilled cinder block building 8 4x8x1 4 steel sheets for thermal cutting 8 flattened expanded steel sheet metal for barricades 8 steel platers 3 8 thick 6 diameter 20 cmu blocks 100 chain link fencing material 3 10 steel i beams of various sizes and thickness for cutting with thermal t
AI helper
The contractor must provide materials, construction, and labor for building construction at Fort Benning, GA. Deliverables for potential fourth courses will be communicated to the contractor no less than 90 days prior to the beginning of a fourth course. All targets shall be set up and or put together for an onsite inspection by the regimental master breacher, no later than one working week prior to the start of a course. All wall and brick building targets shall be constructed and available for an inspection 21 days prior to their planned use during the course. The contractor shall provide all necessary equipment and materials to complete construction of the following targets prior to the beginning of each course.
The bid notice states that deliverables for potential fourth courses will be communicated to the contractor no less than 90 days prior to the beginning of a fourth course.
Add keywords for your products or services. Smart Search helps catch related opportunities beyond exact matches.
2
Start the trial and receive alerts
Use the 14-day free trial and get email alerts with documents or official posting links.
3
Tune your feed
Adjust keywords, regions, email schedule and email style. Use map view and filters when you want to explore.
What our users say
90% recommend BidHits™ (1053 real users, 05/21/2026).Methodology
All bids related to our product are captured by you and sent to us. In my opinion, it’s perfect—broad coverage and easy searches across the bid documents.
R. M. Ferreira
They deliver on their promises. The information is simple and straightforward.
G. G
They provide information on a wide and varied range of purchasing processes. All the necessary details are also included.
J. M. Defelitto
Very good and accurate information about the tenders: consistent and precise.
G. R. Ortiz
The tool is truly effective at scanning bid documents, efficiently delivering bids.
G. D. Reis
The idea of ​​using a keyword and sending the information by email is very good.
We selected the most helpful reviews from real users. Order may change periodically.
I closed deals thanks to the information gathered by the search tool. There’s no need to research across multiple media outlets.
J. Comunale
It is complete and optimal, it improves my time.
R. de L. Cruz
Excellent information. Just what I was looking for.
L. H. Borrelli
Practicality, speed, trust, and credibility—that’s what the work conveys. The information is precise and sharply targeted.
N. De Lima
It encompasses all portals in one place.
G. Ferrea
They notify me promptly when a contest is published.
L. Salazar
It helps me identify areas of opportunity and find bids related to my work area.
I. J. R. Beltran
The email alert is amazing. I really liked the speed — the bid notices arrive by keywords directly in my inbox, which makes searching much easier. I only need to focus on the other processes, which is a big relief.
T. Santos
The search engine that finds what I'm looking for just by entering keywords
J. P. L. Construccion
Not only is the service excellent, but the support when I have questions is great too—the site has really impressed me.
BidHits™ is a government bid search engine that monitors official portals and brings relevant federal, state and local opportunities into one place. You can search on the site and receive scheduled email alerts.
Enter your email and activate the trial. For 14 days you can use the main features, including alerts and access to results. When it ends, if you do not subscribe at /subscription.php, the bid list becomes limited and you will not be charged automatically.
1) Add keywords that describe what you sell. 2) Start the trial. 3) Adjust regions, delivery times and email style after signup.
Whenever possible, yes. Some official portals require login or block direct links; in those cases we point you to the official process page so you can download the documents.
Yes. You can filter by region, procurement method, dates and value ranges. You can also save preferences for future alerts and searches.
Yes. In the dashboard you can see bids on a map and use it to plan follow-up by location.
It can happen. Smart Search uses your keywords to find related opportunities, not only exact matches. Add specific terms and remove off-topic results to improve future alerts.
Yes. You can query bids via API. Documentation at /api_integration.php. Ideal for CRM, BI and automations.
In Settings you can pause alerts or adjust delivery times. If you want to delete your account, just contact us. During the free trial there is no auto-charge.
We monitor major official sources every day at the federal, state and local levels. New bid notices are added as soon as they are captured from the source portal.
Plans start at $ 43.00/month. You can begin with a free trial and there is no auto-charge.
Add what you sell, get scheduled alerts, open documents or the official page, and use filters by region and method.
Transcript
Welcome to BidHits™.
Finding public tenders and bids is important. But what really matters is quickly identifying the opportunities that match what your company sells.
To get started, enter a few keywords that describe your products or services. BidHits™ shows relevant opportunities, highlights your keywords, and organizes everything by date.
Smart search is already enabled and uses artificial intelligence to expand your results, even when the tender uses different words from the ones you searched for.
For each opportunity, you can view a summary, access documents, mark it as a favorite, add private notes, remove what is not relevant, or view it on the map.
You can also use filters, run searches, and explore the day's opportunities directly on the map.
Start using BidHits™ now. It's fast, practical, and you can try it for free.
AI Assistant
Ask me about the bid...
Loading summary...
Methodology
Unaided survey with 1053 active users, conducted through 05/21/2026.
Single question: "Would you recommend our services to a friend or colleague?" - 90% answered "yes".