Santa Clara Valley Water District
Construction Management Services Sunnyvale East and West Channels Flood Protection Project The selected experienced and qualified construction management Consultant( s) will be tasked with providing construction management services for the Sunnyvale East and West Channels Flood Protection Project ( SEWCFPP). The Project construction consists of the following: 1) Clearing and grubbing within the Project limits, including the removal and legal disposal of the designated trees, debris, and other miscellaneous
Construction Management Services Sunnyvale East and West Channels Flood Protection Project 1. Clearing and grubbing within the project limits, including the removal and legal disposal of the designated trees, debris, and other miscellaneous items 2. Demolition, removal, and disposal/recycle of existing rock slope protection, concrete channel improvements, sacked concrete, other structures, concrete features, fences, rubble, and other debris within project limits 3. Spread footing and cast- in- drilled- hole ( CIDH) floodwall construction. CIDH piles are anticipated to be placed in wet conditions and will utilize inspection pipes for acceptance testing 4. Box culvert construction and box culvert extension and channel transition structures, including partial and full removal of existing RCB structures, and staged construction of triple- cell box culvert including staged demolition of existing East Caribbean Drive bridges 5. Headwall construction on existing city and Caltrans bridges, and existing city owned bo
Bid Close Date: