Commonwealth Of Kentucky - Facilities & Support Services - KY
Concrete/ Concrete Work
Rfb- 33- 27 ****, perry county
Construction Services, Reclamation, Drainage Control, Earthwork, Concrete Work, Pipe Installation, Fence Installation, Subdrain Installation, Retaining Walls, Silt Control 1. Reclamation: Removal of approximately 7. 5 acres of slide material to rock, installation of ditches for drainage. Excavation and transport of slide materials to waste area. Reclamation work includes concrete ditch work and reinforcing steel. 2. Drainage System: Installation of 15- 36 inch HDPE pipes and concrete headwalls. 3. Boulder Breaking: Hoe ram for breaking boulders and constructing rock excavated ditches. 4. Backfill: Class II backfill for wall ditches to enhance slope stability. 5. Gravity Walls: Concrete gravity walls for the Bryant residence and Gail Smith residence to ensure stability. 6. Ditch Construction: Class III/IV backfill for ditch construction as directed by the engineer. 7. Temporary Barriers: Temporary debris barrier wall to protect residential areas during excavation. 8. Fencing: Chain link fence installation abo
Bid Close Date:
Lot 1: ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB. Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. On this line, Bidders must enter $ 0. 00 for Contract Amount in the e- procurement system. Actual Contract Amount must be entered on " Official Bid Document" and submitted as an attachment in the e- procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct. Entire Official Bid Document and Bid Bond ( if required) should be combined as one PDF and uploaded Reclamation consists of the removal of approximately 7. 5 acres of slide/transition ( Slide A) material to rock and the installation of ditches to control drainage. Slide B is included to excavated to rock, to provide for a stable access on the Hazard 7 Level. An Earthwork Bid Item is setup to excavate and transport slide materials to the waste area, via the Hazard 7 bench and Upper Second Creek Road. Material will be placed, graded and compacted at the waste area. Reclamation work at the Slide & Transition area will include the installation of Concrete ditch work ( Concrete Form & Finished) to properly handle surface runoff. Reinforcing steel is included for proper concrete ditch construction. Installation of 15 18, 24 & 36 HDPE pipes & Concrete Headwalls are included to handle surface runoff from the site. A Hoe Ram bid item is included to break boulders and construct rock excavated ditches. Class II Backfill is included to properly backfill Wall & ditches to enhance slope stability above these features. Concrete Gravity Wall are included to ensure the Bryant Residence is not undercut by the proposed surface drainage work; Concrete Gravity Wall is included at the Gail Smith Res, to ensure long term stability of the residential area. Class II/III is included for ditch construction were called for in the plans and as directed by the ENGINEER. Tempo