Moses Lake Stormwater Pump Station Project This project involves the installation of a high- capacity stormwater pump station intended to pump water from Moses Lake into Galveston Bay. Moses Lake and Galveston Bay are separated by a USACE hurricane protection levee that encircles a large majority of the City of Texas City. The proposed pump station would have a total capacity of 136, 000 gallons per minute, using four ( 4) engine- driven stormwater pumps and four ( 4) diesel engines, four 36- inch discharge