Dept Of Defense- Dept Of The Army- Usace- Lrd- W072 Endist Detroit
Lexington Harbor Breakwater Repair - *** Amendment **** is issued to remove FAR Clause ****- 27 - Site Visit ( Construction) and to provide organized site visit information within Section 00 21 13 - Instructions to Bidders. Reference the amendment for full details. *** Lexington Harbor Br
y1pz construction of other non building facilities amendment **** is issued to remove far clause **** 27 site visit construction and to provide organized site visit information within section 00 21 13 instructions to bidders. reference the amendment for full details. lexington harbor breakwater repair. breakwater repair operations at lexington harbor. the north breakwater is a permeable rubble mound structure and allows sand shoaling within the harbor. voids in the north breakwater are exacerbating sediment infiltration within the harbor. a walkway is present atop the north breakwater. the walkway is approximately 5 feet wide and generally in good condition. the north breakwater voids are partially sand filled. the sand fill depth varies however, sand generally extends to the existing water elevation. the project objective is to alter the existing permeable rubble mound breakwater structure to an impermeable structure. the proposed scope of work includes constructing a grout curtain wall within the structu
Bid Close Date: