Board Of Water Works Of Pueblo
Pueblo Water - WHITLOCK SOUTH 5MG POTABLE WATER STORAGE TANK REFURBISHMENT Project OverviewPueblo Water seeks the qualifications of Consultants to provide engineering plans, specifications, construction management and construction inspection for the inside refurbishment of a 5 MG steel potable water storage tank located at the Whitlock Treatment Plant located in Pueblo, Colorado. Anticipated Work to include Dive Inspection, replacement plan for interior structural members, design and plans for additional ve
Bid Close Date: