City Of Imperial Beach
Sewer Pump Station 8 Rehabilitation The project shall include furnishing of all labor, materials, equipment and means to construct the project entitled City of Imperial Beach PS- 8 Rehabilitation, as shown on thedrawings and described in these Contract Documents. The summary of work includes, but is not limited to, the following: 1. During the PS- 8 Upgrades construction, the entire PS- 8 station will be shutdown. During this shutdown the flow will be diverted to PS- 9 through a gravity manhole and pipeline
Bid Close Date: