Department Of Environmental Protection - PA
Amrp Centerville Borough Washington Cnty - The Principal Items Of Work And Approximate Quantities Are Implementation Of The Erosion And Sediment Pollution Control Plan Rock Construction Entrance 1 Each Implementation Of The Erosion And Sediment Pollution Control Plan Compost Filter Sock 12 Diameter 1 108 L F Implementation Of The Erosion And Sediment Pollution Control Plan Weighted Sediment Filter Tub 38 L F Clearing And Grubbing 3 15 Acre Permanent Channel Excavation 1 046 C Y Rock Lined Channel 1 017 S Y
implementation of the erosion and sediment pollution control plan implementation of the erosion and sediment pollution control plan rock construction entrance, 1 each implementation of the erosion and sediment pollution control plan compost filter sock 12 diameter, 1, 108 l. f. implementation of the erosion and sediment pollution control plan weighted sediment filter tub, 38 l. f. clearing and grubbing, 3. 15 acre permanent channel excavation, 1, 046 c. y. rock lined channel, 1, 017 s. y. ford crossing, 2 each pipe installation thirtyinch 30 reinforced concrete, 295 l. f. dewatering impoundment, 1 l. s. selective grading, 2. 95 acre. planting planting preparation, 2. 95 acre
Bid Close Date: