PARTS KIT, BALL VALV - CONTACT INFORMATION 4 **** WVN ( 717) 605- **** ***@***. *. * ITEM UNIQUE IDENTIFICATION AND VALUATION ( JAN 2023) 19 HIGHER- LEVEL CONTRACT QUALITY REQUIREMENT ( NAVICP REVIEW FEB ****)( FEB ****) 1 see specificatio
AI helper
The deadline for submitting offers has been extended to 4:30 PM local time on October 7, 2025. This extension is due to technical difficulties with drawing uploads. The award will be issued bilaterally, requiring the contractor's written acceptance. The delivery schedule includes submission of certification data 20 days prior to delivery, review and acceptance of certification documents within 6 working days, and final delivery within 300 days of the order's effective date. Past performance will be considered in the evaluation of offers. Drawings are available at www. ***. *. * requires approval. Contact the point of contact listed in the solicitation to request access. The material covered in this contract purchase order will be used in a crucial shipboard system. Special emphasis material level I, scope of certification, or quality assured, and special control procedures are invoked to ensure receipt of correct material. Applicable documents, including modifications or exclusions, are listed. Specification revisions are detailed. Detailed requirements for parts, material, testing, certification, pressure tolerance, thread inspection, surface waviness, seat stack height measurement, visual inspection, welding, brazing, configuration control, waivers, deviations, engineering change proposals, certificate of compliance, mercury-free requirements, marking of material, quality assurance, packaging, and preservation are included. Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via wawf (wide area workflow). No material is to be shipped prior to the receipt of acceptance.
The bid notice states final delivery will be on or before 300 days after the effective date of the order.
The bid notice states one year from date of delivery.
The bid notice states avsup wss mechanicsburg will be considering past performance in the evaluation of offers in accordance with far **** a 2.