Dept Of Defense- Dept Of The Army- Usace- Nwd- W071 Endist Omaha
Big Bend Lower Brule North Ecosystem Restoration, Element 1 Phase 2, Lower Brule, SD - On or about 10 November 2025, the Government intends to issue the Invitation for Bid ( IFB) for & ldquo; Big Bend Lower Brule North Ecosystem Restoration, Element 1 Phase 2, Lower Brule, SD& rdquo;. & n
z2pc repair or alteration of unimproved real property land lower brule north element 1 phase 2 includes 100 foot wide riparian planting bench, gravel maintenance path along the entire reach 3, stone toe revetment to protect the shoreline from erosion, 2. 12 acre peninsula protected from erosion by a 920 foot long l head dike that would be constructed offshore from the peninsula. the protected open water area between the l head and the peninsula will develop into a 3. 75 acre emergent wetland and this will also create approximately 17 acres of riparian habitat. related tasks include earth moving, grading, bank shaping, rock installation, water management, fill, and topsoil placement.