The contractor must furnish all labor, material, equipment, and supervision for replacing high efficiency stainless steel condensing hot water boilers in specified buildings. Work includes demolition and new construction. The performance period is 365 calendar days after NTP. A site visit is scheduled for **** at 9am EST. The award will be made to the lowest price technically acceptable offeror. SDVOSB is set aside for this acquisition.
The contract period is 365 calendar days after receipt of notice to proceed.
Boilers shall include manufacturers standard form in which manufacturer agrees to repair or replace components of boilers that fail in materials or workmanship within specified warranty period.
The procurement action is a lowest price technically acceptable lpta source selection process in accordance with rfo ****.
Offerors must demonstrate successful completion of at least two construction projects replacing high efficiency, fully condensing, firetube hotwater boilers.
A site visit is scheduled for **** at 9am est building 2, second floor, room 216.
When required, the contractor shall submit samples for approval at the contractors expense, with all shipping charges prepaid.
Failure to provide proof of SBA certification or DSBS registry will render the proposal technically unacceptable and nonresponsive.
The magnitude of construction is between 2,000,000 and 5,000,000.