Elevator Replacement/ Elevator Modernization/ Elevator Installation/ Elevator Maintenance/ Elevator Commissioning/ Elevator Certification/ Elevator Controls/ Elevator Safety Systems/ Elevator Parts Supply/ Elevator Manufacturing/ Elevator Repair
North Chancery Elevator Replacement, US Embassy Budapest -
Complete replacement of three elevators in the north chancery at U. S. Embassy Budapest Removal and disposal of existing elevator equipment, replacement of elevator cars, motors, controllers, drives, and door systems, modernization of control and safety systems, integration with fire alarm, emergency power, and life safety infrastructure, commissioning, testing, certification, turnover, warranty support, operator and maintenance training, dismantling plans, approval plans, permits, working- stage technical plans, manufacturing and delivery of elevator components, shaft lighting, installation hooks, pit access ladder, sealing of gaps
AI helper
Sole source firm-fixed-price contract to Kone Corporation for complete turnkey replacement of three elevators at U. S. Embassy Budapest. Includes labor, materials, equipment, engineering, commissioning, testing, certification, training, warranty. Estimated value 656,**** of performance approximately 12 months. Justification based on proprietary Kone systems and incumbent service provider. Notice posted on SAM. gov on May 13, 2026. One vendor responded but lacked capability.
The period of performance is approximately twelve months from notice to proceed through final commissioning and turnover. the anticipated period of performance is approximately twelve 12 months from notice to proceed through final commissioning and turnover
The contract includes warranty support. warranty support and followon serviceability
Kone is uniquely qualified due to existing installed system compatibility and proprietary systems integration. kone corporation is uniquely qualified to provide the required services based upon existing installed system compatibility, proprietary systems integration, lifecycle standardization, and operational continuity requirements
One vendor responded but failed to provide clear evidence of capability. east coast technologies provided a capabilities statement but failed to provide any clear and convincing evidence to show that they could supply kone elevators within budapest, hungary
The estimated contract value is 656,****. the anticipated contract value for this procurement, including all options, is estimated at approximately 656, ****