Dept Of Defense- Dept Of The Air Force- Air Force Materiel Command- Air Force Sustainment Center- Fa8137 Afsc Pzioc
Design Engineering
TINKER AFB MAC BOA **** - Replace Vault and Fuel Tank, **** - THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY Updated 12 June 26 1) Amendment 2 issued to change the proposal due date from 4: 00pm on 19 June 2026 to 2: 00pm on 22 June 2026. Please include signed sol
Replacement of a fuel tank and vault, including design engineering services, materials, labor, and testing for the installation of a new above- ground diesel tank, ventilation, fuel piping, electrical upgrades, and structural repairs. Installation of a new above- ground diesel tank inside **** at Tinker Air Force Base, including design, engineering, materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals. The project also includes new ventilation and fuel piping, electrical upgrades ( LED lighting with battery backup, new panels, fuel system connections), structural repairs ( supporting MEP installations, repairing corroded steel hoist structure), and upgrades to civil, architectural ( masonry repairs), new roof, structural, mechanical, and electrical systems.
Bid Close Date: