Village Of Sleepy Hollow-NY
64- 68 Beekman Avenue Site Cleanup Project
Site cleanup project at **** Beekman Avenue Clearing, grubbing and vegetation removal; topsoil stripping, stockpile and reuse; demolition debris removal and legal disposal; removal of masonry/foundation remnants; unsuitable soil removal; clean backfill subgrade correction; site grading and earthwork; dense graded aggregate crusher run surface; infiltration interceptor stone trench; chain link fence installation; 12- foot- wide chain link gate; reinforced CMU wall opening infill; sidewalk/basement access door and pit restoration; existing wall retaining wall repair; dust control and housekeeping; public right- of- way protection and restoration; final stabilization and cleanup; unknown utilities concealed conditions allowance; permit inspection fee allowance; as- built final quantity verification; independent temporary access stair/platform at Beekman gate; delegated structural design sealed engineering; drainage infiltration validation adjustments
Bid Close Date: