Hood River Or, City Of
Taylor Avenue, A Street and 15th Street Water Main Replacement- The project area of work defined by this Contract is in Hood River, Oregon. The project area is located on Taylor Avenue, A Street, and 15th Street, Hood River OR **** elements within the project limits include installing 3, 065 feet of 8 C- 900 water pipe, fifty- nine inch water meter assemblies, twenty- nine 8 inch gate valves, two- 2 inch water meter assemblies, 886 feet of inch Municipex pipe, five hydrant assemblies, traffic control
Bid Close Date: