City Of Post Falls
SH- 41 and Poleline Ave. Gravity Sewer Pipe # ****, SSMH **** & **** Rehabilitation- Schedule A: Improvements to the gravity main rehabilitation includes installation of approximately 254 LF of 15 sanitary sewer pipe, two ( 2) doghouse manholes, and one ( 1) manhole to bypass existing infrastructure and redirect flow within the intersection of SH- 41 and Poleline Avenue. Design includes traffic control plans to assist during construction with work required within the ITD right- of- way and intersection. Pro
Bid Close Date: