City Of Weatherford
Tin Top Road Drainage Improvements The project generally consists of the installation of a new storm drain system to address significant ongoing soil erosion occurring within an aging and deteriorating open drainage ditch. The existing ditch, which currently lacks structural integrity, poses a long- term risk to the adjacent roadway due to progressive erosion. The proposed improvements include replacing the failing ditch with an underground storm drain pipe, topped with a minimal surface channel for limited
Bid Close Date: