02/26/2026 - USA | NE | DOUGLAS COUNTY | OMAHA | 68101 Midsize City
GSU Transformer Supply, Oahe Dam, SD & Ft Peck Dam, MT - Project Description: Ft Peck Supply of the generator step- up ( GSU) transformers 4 and 5 located in switchyard # 2 at the Fort Peck Dam. The final suppy contract for the Fort Peck transformers will include: * Design and manufacturing of two ne
transformers: distribution and power station ft peck supply of the generator step up gsu transformers 4 and 5 located in switchyard 2 at the fort peck dam. the final suppy contract for the fort peck transformers will include: design and manufacturing of two new gsu transformers. design and manufacturing of ancillary and control components. performance of factory acceptance testing fat. delivery to the fort peck power plant, offloading at the transformer temporary storage and staging location, transformer reassembly, oil processing and filling, and movement to final operating location as the location is made available by the separate installation contractor. final acceptance testing and commissioning of transformer after interconnection to the power plant is performed by the separate installation contractor. oahe supply of all gsu transformers locatd at oahe dam. the supply contract for the oahe transformers will include: design and manufacturing of 10 new gsu transformers. design and manufacturing of ancillar