The project involves design, management, and construction improvements to an existing laboratory building at the Colorado School of Mines in Golden, CO. The scope includes replacing aging mechanical systems and adding approximately **** sq ft. The selection process is two-step: prequalification (Step I) followed by an oral interview and sealed fee proposal (Step II). The award is based on the best overall value, with qualifications weighted at 70% and fees at 30%. A mandatory preproposal conference and site tour is required on August 25, 2026. Final occupancy is targeted for no later than February 28, 2028.
Final acceptance and occupancy of the project will be no later than Feb 28, 2028. final acceptance and occupancy of the project will be no later than feb 28, 2028.
Selection will be based on a combination of qualifications and costs that represent the best overall value to the state. selection and award of this project will be based on a combination of qualifications and costs that represent the best overall value to the state.
Firms must demonstrate specific design-build contracting experience within the last ten years for at least two projects each in excess of 10,000,000 hard costs. demonstrated specific designbuild contracting or similar contracting services within the last ten 10 years for at least two 2 projects each in excess of 10, 000, 000 hard costs
A mandatory preproposal meeting will be held at: the colorado school of mines, student center: building address: **** 16th street, golden, co room: ballroom d datetime august 25, 2026, 11am to 12pm. a mandatory preproposal meeting will be held at: the colorado school of mines, student center: building address: **** 16th street, golden, co room: ballroom d datetime august 25, 2026, 11am to 12pm
Request for clarifications due September 2, 2026. request for clarifications due september 2, 2026
Firms failing to meet the minimum required qualifications will not receive further consideration. firms failing to meet the minimum required qualifications will not receive further consideration.
The estimated project cost is 15,000,000. estimated project cost: 15, 000, 000