City Of Madison - WI
**** - Pressure Zone 4 Interstate Crossing Work under this contract generally consists of installing 6- inch, and 12- inch ductile iron water main, fittings, valves and hydrants by open- cut and/or horizontal directional drilling methods and installing 16- inch water main and fittings by horizontal directional drilling methods. The total water main installation comprises approximately ****- LF of new pipe.
Bid Close Date: