City Of Farmington - NM
Summit Dr. Waterline Replacement - The City of Farmington, New Mexico (" OWNER") is requesting Bids to furnish all labor, equipment, and materials to replace the old 1, 520- foot, 6- inch cast iron water main line and customer service lines with new 8- inch PVC lines. Unless otherwise stated in the Contract Documents, Engineering for this project, along with the Contract Documents, were completed by the City of Farmington, Municipal Annex Building, 805 Municipal Drive, Farmington, New Mexico
Summit Dr. Waterline Replacement 1 8 pvc water main dr18 2 6 pvc water main dr18 3 8 gate valve with box 4 6 gate valve with box 5 cut and cap existing watermain 6 iron fittings, 12 dia. under 7 6 megalug ductile or pvc 8 8 megalug ductile or pvc 9 water service connection new main to existing meter can to remain in place 58 or 1 1 addl length of service pipe for 58 1 services 1 phys. separate existing waterline to cut in valve or fitting, all sizes and types 1 fire hydrant 4, 5, or 6 1 remove existing fire hydrant all depths 1 air relief valve assembly inc. vault 14 pipe or larger 1 load, haul dispose unsuitable material 10 mile free haul 1 pipe bedding material for pipe trench 1 2 standard curb gutter rem. , disp. rplce 1 4 concrete sidewalk or slope pavement remove, dispose replace 1 6 drivepad or valley gutter removal, disposal, replacement 2 subgrade prep 2 base course in place 2 asphalt removal disposal, 10 mile free haul 2 hot mix sp iv or equivalent 2 traffic control 2 testing allowance 2 portable toil
Bid Close Date: