Uaf - University Of Alaska Fairbanks-AK
IFB 2025- 01 UAS SITKA CAMPUS NEW DOCK - PHASE 1 The work consists of construction of a floating dock attached to the coast by steel struts and concrete abutments, routing utilities in a trench from the existing UAS Sitka Campus building across the parking lot to the struts and down to the dock, and floating wave attenuators anchored offshore. BID OPENING 2: 00 pm Wednesday, October 29, 2025 Location: UAS Facilities Planning and Construction Conference Call ( 907) 796- **** Meeting **** Attendee ****
Bid Close Date: