City Of San Antonio - TX
Barbara Drive Drainage Phase 3 LF ( 2022 Bond) - Upgrading existing underground stormdrain system from 2- 9 x6 culverts to 3- 10 x9 box culverts including roadwayreconstruction, curbs, sidewalks, and driveway approaches as applicable andwithin available funding. Additionally, El Montan Street will be reconstructedto restore street flow capacity and curb height, with sidewalks, driveways andother necessary items with available funding. Scope also includes SAWSwater/sewer and CPS Gas relocations and surf
Bid Close Date: