AI helper
This is a Request for Qualifications (RFQ) for a feasibility study to evaluate and identify the optimal future alignment for FM 917 on either side of the existing railroad crossing and connection to FM 2280. The study will assess multiple alignment alternatives considering various factors including roadway geometry, traffic operations, safety, constructability, drainage, right-of-way impacts, environmental constraints, utility conflicts, and coordination with the railroad and TXDOT. Public and stakeholder input will be incorporated. Upon completion, the project is expected to advance to schematic design and environmental documentation. The selected firm will be the prime provider for feasibility route studies, schematics, environmental documents, hydrology and hydraulic studies, geotechnical testing, and PSE. Other potential services include right-of-way maps, surveys, aerial mapping, subsurface utility engineering, right-of-way acquisition, construction management, and inspection services. Key dates include: Questions Due Date: May 6th, 2026, 2:00 PM CDT; Close Date: May 27th, 2026, 2:00 PM CDT. Required documents for submission include Statement of Qualifications Signature Form, Certificate of Eligibility Federal, Certificate of Eligibility State, Compliance with State Federal Laws, Vendor References, Residence Certifications, W9, Disadvantaged Business Enterprises Only, Lobbying, and Antiboycott, Anti Discrimination, Child Support Arrearage, and China Tech verifications. Conflict of Interest Questionnaire and Addendums are optional.
The bid notice does not specify a delivery deadline for the services to be performed, only the submission deadline for proposals.
The bid notice requires a Statement of Qualifications Signature Form, Certificate of Eligibility Federal, Certificate of Eligibility State, Compliance with State Federal Laws, Vendor References, Residence Certifications, W9, Disadvantaged Business Enterprises Only, Lobbying, and Antiboycott, Anti Discrimination, Child Support Arrearage, and China Tech verifications. The bid notice states firm will be selected as prime provider with possible services to develop and prepare feasibility route studies schematics environmental documents hydrology and hydraulic studies geotechnical testing and plans, specifications, and estimate pse for the project.
The bid notice states that questions are due by May 6th, 2026, 2:00 PM CDT, which can be considered a deadline for clarification or objection.