USA | WA | CLARK COUNTY | VANCOUVER | 98666
Midsize City
Stone Masonry
WY NP YELL 10( 24), Grand Loop Road Norris to Golden Gate, Phase 3 - Update 10/20/2026: QA 10- 20- 2026. pdf posted to attachments. Update 10/5/2026: QA 10- 05- 2026. pdf posted to attachments. PROJECT: WY NP YELL 10( 24), Grand Loop Road Norris to Golden
4R roadway reconstruction, excavation, blasting, rock scaling, embankment, drainage improvements, parking area improvements, roadside improvements, retaining wall construction, stone masonry, utility relocation, waterline construction, boardwalk construction, obliteration, base aggregate, asphalt paving, concrete curb and gutter, striping, and signage 4R roadway reconstruction, excavation, blasting, rock scaling, embankment, drainage improvements, parking area improvements, roadside improvements, retaining wall construction, stone masonry, utility relocation, waterline construction, boardwalk construction, obliteration, base aggregate, asphalt paving, concrete curb and gutter, striping, signage
AI helper
Project involves 4R roadway reconstruction, excavation, blasting, rock scaling, embankment, drainage, parking and roadside improvements, retaining wall, stone masonry, utility relocation, waterline, boardwalk, base aggregate, asphalt paving, concrete curb and gutter, striping, and signage. Length: 0. 7 miles and parking lot. Tentative completion: fall 2028. Contract type: firm fixed price task order. Estimated price range: between $45,000,000 and $55,000,000. Solicited to Yellowstone Grand Teton MATOC contractors. Anticipated solicitation winter 2026/2027. Preliminary plans and letter posted electronically.
The estimated price range is between $45,000,000 and $55,000,000. estimated price range: between 45, 000, 000 and 55, 000, 000