Interior, Department Of The- National Park Service- Mwr Midwest Region( 60000)
P-- WICR Demolition and Removal of Excess Building, Etc. - WICR Demolition and Removal of Excess Building, Etc. The National Park Service ( NPS) is conducting a market survey to determine the interest and capability of contractors for a possible upcoming project. All costs associated with providing
demolition and removal of excess building removal of house, 2 utility poles, permanent well abandoning capping, removal of associated septic tank, concrete pad, and rail fence. following removal of structures, any remaining fillgravel, concrete, and brick shall be removed. any exposed utilities shall be capped and buried at a minimum of 18 in below ground level. remaining holes shall be filled, leveled, and graded using clean soil with at least a 4inch top layer of clean topsoil. all fill soil shall be provided by the contractor and inspected by contracting officers representative cor. the septic tank shall be uncovered, pumped out by contractor, and be disinfected with lime prior to removal. soil shall be free of any contaminants, construction debris, and have no rocks over 4 inches in diameter. new soil shall be compacted to ensure there is no settling or ground erosion. if there is any noticeable settling after one year the contractor shall refill, compact, and reseed in those areas. all groundwork shall p
Bid Close Date: