Dept Of Defense- Dept Of The Air Force- Air Force Materiel Command- Air Force Sustainment Center- Fa8571 Maint Contracting Afsc Pzim
Polypropylene Tanks/ Control Panels
LIFT STATION REDESIGN **** - The Contractor shall provide all the tools, parts, materials, equipment, labor, transportation, startup, and training for a redesigned lift station to the Commodities Maintenance Group ( CMXG) at Robins Air Force Base ( AFB), Georgia. These lift sta
Lift Station Redesign Redesigned lift station including two electric pumps ( CPVC or 316 stainless steel, 2 nominal size fittings, 25 GPM flowrate, 30 ft TDH), polypropylene tank ( 50- 75 gallons, single containment), stainless steel control panel enclosure, and 120V or 208V power supply with disconnect switches, hands- off- auto, and level sensors.
Bid Close Date: