Construction of an airlock wall (approx. 60ft W x 38ft H) with a 24ft W x 21ft H high-speed overhead door and a standard mandoor at Rock Island Arsenal. Contractor responsible for design, supply, installation, and site preparation. Must comply with fire safety standards (NFPA 701, ASTM E84), OSHA, and federal regulations. Delivery and installation hours restricted to weekdays 6:00 AM-3:30 PM. Security clearance and training required for personnel. Final acceptance after performance testing and inspection.
All equipment must be delivered at the same time, meaning the same day multiple trucks are acceptable unless preauthorized to deliver on multiple days by the riajmtc contracting officer. all equipment shall be delivered at the same time, meaning the same day multiple trucks are acceptable
Vendors must be capable of the work as described and have it as one of their core competencies. we are looking for vendors where the work required is one of the vendor's core compencies.
Site inspections are the sole responsibility of the contractor and may begin prior to completing the bidding process. any site inspections and/or measurements, which must be taken in order to determine the suitability of the proposed location or to perform the design of the system, are the sole responsibility of the contractor.
Ambiguities or discrepancies must be reported in writing to the contracting officer before the date scheduled for close of bidding/receipt of proposal. shall be reported by the bidder in writing to the contracting officer before the date scheduled for close of biddingreceipt of proposal.
Later claims for labor, material, or equipment required, or for difficulties encountered, which could have been foreseen had such reasonable examination been made, may be denied. later claims for labor, material, or equipment required, or for difficulties encountered, which could have been foreseen had such reasonable examination been made, may be denied.