Dept Of Defense- Dept Of The Army- Usace- Other_ Division- W2R2 Usa Engr R And D Ctr
Special Notice to Sole Source Purchase of Supply BLS Gas Flow Controller - The U. S. Army Corps of Engineers, Engineer Research and Development Center ( ERDC) Geotechnical and Structures Laboratory ( GSL), Structural Mechanics Branch ( SMB) intends to award a sole source basis in accordance RFO FAR ****( b) to Stumptown Res
Supply BLS gas flow controller One combustible gas system flow controller for the BLS 8. The compressed gas driven simulator must include: the ability to adhere to the same specifications as the existing combustible BLS gas system flow controller. The components must consist of one main valve rack and one driver valve rack. The main valve rack must house the flow controllers, flame arresters, driver isolation valves, and the driver. The driver valve rack must house the spring return isolation valves, venturi evacuation pump, and electric match connection. The gas delivery system must be controlled with a provided control unit, which is equipped with an emergency shut off E- stop switch and performs multiple operations simultaneously.
Bid Close Date: