Department Of Environmental Protection - PA
Compost Filter Sock
Amrp Hyde Lk S Horton Twp Elk Cnty - The Principal Items Of Work And Approximate Quantities Are Implementation Of The Erosion And Sediment Pollution Control Plan Rock Construction Entrance 2 Each Implementation Of The Erosion And Sediment Pollution Control Plan Compost Filter Sock 32 Diameter 17 890 L F Clearing And Grubbing 123 Acre Grading Grading Area 1 605 942 C Y Grading Grading Area 2 760 081 C Y Grading Reestablish Roadways 11 280 L F Seeding Planting Preparation 123 Acre Seeding Grass Seed 8 610 Lb
implementation of the erosion and sediment pollution control plan rock construction entrance, 2 each implementation of the erosion and sediment pollution control plan compost filter sock 32 diameter, 17, 890 l. f. clearing and grubbing, 123 acre grading grading area 1, 605, 942 c. y. grading grading area 2, 760, 081 c. y. grading reestablish roadways, 11, 280 l. f. seeding planting preparation, 123 acre seeding grass seed, 8, 610 lb. incorporation of paper mill sludge, invoice permanent channel excavation, 404 c. y. rock lined channel, 878 s. y. subsurface drain, 400 l. f. brush barrier, 10, 050 l. f.
Bid Close Date: